Renfrewshire Council is embarking on a £1.5m rebuild of Paisley's Abbey Bridge. Diversions are in place and access to businesses on Bridge Street from Orchard Street and Lonend has been kept open.
Renfrewshire House, Paisley Abbey and the Town Hall can be accessed from Cotton Street.
The project will see anti-corrosion paint being applied to the steel carriageway girders and the dilapidated cast iron parapet and fascia panels, both footways and the bridge deck waterproofing and movement joints being replaced.
The first stage of the massive project saw two prototype parapet panels being cast for use in crash tests designed to simulate a vehicle hitting the railings. The data from these tests is being used to confirm the results from a mathematical model of the prototypes, created using the latest structural analysis software. Once the tests are complete, a full set of new parapets and facia panels will be cast and installed.
The original facia panels, weighing a total of 13 tonnes, were removed in June 2008 for safety reasons.
The Abbey Bridge parapets lack the movement joints built into modern structures to allow them to expand and contract in changing temperatures. This means the original cast iron components have buckled and fractured over the years. The way the fascia panels were attached to the supporting girders also meant that it was impossible to maintain the outer girders and this has contributed to the deterioration.
The Abbey Bridge was built by Hanna, Donald and Wilson in 1879 and was widened in 1933. The original ironwork was made by the Abercorn Foundry in Paisley.
In 1993 a survey of the bridge found the 1933 era carriageways could cope with 40 tonne vehicles but the footways, dating from 1879, could only take the weight of pedestrians. Bollards were installed as a temporary measure to protect the footways from vehicles accidentally mounting the pavement.
(GK/JM)
Construction News
06/05/2009
Work Starts On £1.5m Project To Renovate Victorian Bridge

16/04/2025
Construction work on the £5 million repair and refurbishment project at the Loch Centre in Tranent is scheduled to commence in June 2026.
East Lothian Council has announced the anticipated start date for the significant upgrade to the well-used community facility.
Under the current timetable, the

16/04/2025
A £636,000 project to install solar panels at the Gorbals water pumping station in South Ayrshire has been successfully completed.
The scheme aims to provide a renewable energy source for pumping water to thousands of customers in the region.
The project involved the installation of 793 solar pan

16/04/2025
A planning application has been lodged with Glasgow City Council by The JR Group, acting on behalf of Wheatley Group, for the construction of 29 much-needed affordable homes in the Baillieston area of the city.
The proposed development on Caledonia Road will offer a mix of one- and two-bedroom apa

16/04/2025
Residents in 20 blocks of flats across Coatbridge are already experiencing the positive impacts of a recently completed, ambitious energy efficiency refurbishment project.
The extensive construction work has delivered significant improvements to the properties, including the installation of cavity

16/04/2025
Ground investigation works are commencing this month at the proposed site for Orkney Islands Council’s Scapa Deep Water Quay at Deepdale in Holm.
These initial investigations will be followed by marine-based site investigation works scheduled to begin in June.
These works form part of the Pre-Con

16/04/2025
Construction work has been finalised on a significant new housing development in Motherwell town centre, delivering 42 newly built, highly energy-efficient flats alongside the respectful conversion of the B-Listed YMCA building into a further six homes. The project, part of North Lanarkshire Council

16/04/2025
The Construction Industry Training Board (CITB) has today released its year-end performance data for its New Entrant Support Team (NEST), revealing a significant increase in apprenticeship starts. During the financial year 2024-25, NEST supported 4,128 individuals in commencing apprenticeships, a su

16/04/2025
A water-powered mill in Angus is set to grind grain once again after receiving a record-breaking donation to fund its restoration.
The National Trust for Scotland has announced that a long-time member of the conservation charity has gifted an incredible £2.4 million, one of the largest single dona

15/04/2025
Construction of a £70 million student accommodation development at 292-298 St Vincent Street in Glasgow has reached a significant milestone, with the building now visibly rising from the ground.
Drone footage has captured the progress of the project, which is a partnership between developer Artisa

15/04/2025
Energy regulator Ofgem is expected to confirm today (April 15) its finalised Connections Reform process, designed to expedite grid connections for renewable energy projects that are ready and crucial for achieving the UK's clean power targets for 2030 and beyond.
The new connections system, anticip