J&E Shepherd Chartered Surveyors, on a joint basis with GVA Grimley, has been appointed to offer an established town centre office location in Ayr for let or sale.
Located at 24 Wellington Square, the traditional two-storey, basement and attic building offers a number of individual office suites ranging in size from 80 sq ft to 3000 sq ft. The subjects form part of a larger building which previously operated as a gym and extends to 5,800 sq ft.
Markus Kroner, surveyor at Shepherd's, said: "The landlords are willing to adopt a flexible approach and would consider leases ranging from individual rooms up to the entire premises.
"The property is situated on Wellington Square, close by its junction with Alloway place in what is one of Ayr's best office addresses. The former gym area has a separate entrance from Wellington Lane to the rear. In addition to on street car parking, the immediate area has a number of public car parks."
Established 125 years ago in Scotland, J&E Shepherd delivers a valuation service throughout the UK, from a network of 32 offices throughout Scotland and over 75 locations in England, Wales and the Channel Islands. It offers a multi disciplinary property service to include valuation, commercial agency, building surveying, rent reviews, development and investment consultancy, rating and property management. J&E Shepherd is now one of the largest independent firms of chartered surveyors in the UK.
(GK/JM)
Construction News
24/02/2009
Shepherd's Offers Town Centre Office Accommodation in Ayr For Let or Sale

15/04/2025
Construction of a £70 million student accommodation development at 292-298 St Vincent Street in Glasgow has reached a significant milestone, with the building now visibly rising from the ground.
Drone footage has captured the progress of the project, which is a partnership between developer Artisa

15/04/2025
Energy regulator Ofgem is expected to confirm today (April 15) its finalised Connections Reform process, designed to expedite grid connections for renewable energy projects that are ready and crucial for achieving the UK's clean power targets for 2030 and beyond.
The new connections system, anticip

15/04/2025
The ambitious transformation of Glasgow’s landmark George Square has moved into a tangible phase with the commencement of the erection of hoardings around the perimeter of the civic space. Starting today, the hoardings will enclose the Square for the duration of its 18-month redevelopment.
The pane

15/04/2025
Members of the public are invited to attend a consultation feedback event to discuss the proposed infrastructure associated with a new underground electricity transmission cable between the Kinardochy and Errochty substations in Perthshire.
The event will take place on Monday, 28 April, from 4 pm t

15/04/2025
Turner & Townsend have been appointed as project managers to develop a business case for the potential extension of the Borders Railway beyond its current terminus at Tweedbank to Hawick and Carlisle.
This key appointment will enable crucial work to progress on the project, including feasibility s

15/04/2025
Arran Community Renewables, a Community Benefit Society based on the Isle of Arran, has secured planning consent for a 6 MW solar farm. The Glenkiln Solar Farm, located approximately 1km west of Lamlash, is projected to generate 5,600MWh of clean renewable energy annually from 2027.
The £5 million

15/04/2025
A new Route Map has been published by the Scottish Land Commission (SLC) to ensure communities across Scotland secure tangible and long-lasting benefits from nature restoration projects and investment in the country's natural environment.
The practical guide is designed for landowners, developers,

15/04/2025
Award-winning principal contractor Procast Group has further expanded its presence across Scotland with the opening of a new base in Dumfries. The Hamilton-based firm has invested £30,000 in a new warehouse and office facility in the Maxwelltown Industrial Estate in Dumfries and Galloway, marking it

14/04/2025
Glasgow City Council's Affordable Housing Supply Programme (AHSP) facilitated the completion of over 1,000 new affordable homes in the city during the past year, despite facing budgetary reductions at the start of the financial year.
The initial grant of £78.687 million from the Scottish Government

14/04/2025
A key phase of Scottish Water's £11.5 million project to upgrade a strategic rising sewer main connecting Renfrew and Glasgow is set to begin, resulting in a significant road closure.
From Monday, 28 April 2025, Ferry Road in Renfrew will be closed to all vehicular traffic for a period of four mont