The Energy Saver for Central Heating Systems with Combi Boilers, gives greater flexibility than the inbuilt timer on the boiler. Complete Time and Temperature control with added protection for overnight frost and periods when the Home is unoccupied.
The TLX6501 is a Slimline fully featured seven-day programmable room thermostat with six predefined and three user programmes allowing absolute flexibility to match the users' lifestyles.
The large back-lit LCD display shows real time clock, room temperature and time profile. The easy to use interface with temporary override facility. SPDT change-over volt free contacts suitable for the controls of heating and cooling, with optimum start feature providing complete user comfort control.
The TLX RFP is the RF wireless version with all the features and benefits of the TLX6501 and an integrated table-top stand on the thermostat to allow comfort control from any room in the house.
In addition the TLX RFP is a simply installed solution for time and temperature control for separate zones, or conservatories with radiant or ‘wet’ underfloor heating systems. The typical transmission range from thermostat to receiver is 30m.
Another innovation from the UK's oldest manufacturer of Central Heating Controls
Information and literature download from www.sunvic.co.uk or tel: 01698 812944.
Construction News
30/06/2008
Central Heating Systems Energy Saver

15/04/2025
Construction of a £70 million student accommodation development at 292-298 St Vincent Street in Glasgow has reached a significant milestone, with the building now visibly rising from the ground.
Drone footage has captured the progress of the project, which is a partnership between developer Artisa

15/04/2025
Energy regulator Ofgem is expected to confirm today (April 15) its finalised Connections Reform process, designed to expedite grid connections for renewable energy projects that are ready and crucial for achieving the UK's clean power targets for 2030 and beyond.
The new connections system, anticip

15/04/2025
The ambitious transformation of Glasgow’s landmark George Square has moved into a tangible phase with the commencement of the erection of hoardings around the perimeter of the civic space. Starting today, the hoardings will enclose the Square for the duration of its 18-month redevelopment.
The pane

15/04/2025
Members of the public are invited to attend a consultation feedback event to discuss the proposed infrastructure associated with a new underground electricity transmission cable between the Kinardochy and Errochty substations in Perthshire.
The event will take place on Monday, 28 April, from 4 pm t

15/04/2025
Turner & Townsend have been appointed as project managers to develop a business case for the potential extension of the Borders Railway beyond its current terminus at Tweedbank to Hawick and Carlisle.
This key appointment will enable crucial work to progress on the project, including feasibility s

15/04/2025
Arran Community Renewables, a Community Benefit Society based on the Isle of Arran, has secured planning consent for a 6 MW solar farm. The Glenkiln Solar Farm, located approximately 1km west of Lamlash, is projected to generate 5,600MWh of clean renewable energy annually from 2027.
The £5 million

15/04/2025
A new Route Map has been published by the Scottish Land Commission (SLC) to ensure communities across Scotland secure tangible and long-lasting benefits from nature restoration projects and investment in the country's natural environment.
The practical guide is designed for landowners, developers,

15/04/2025
Award-winning principal contractor Procast Group has further expanded its presence across Scotland with the opening of a new base in Dumfries. The Hamilton-based firm has invested £30,000 in a new warehouse and office facility in the Maxwelltown Industrial Estate in Dumfries and Galloway, marking it

14/04/2025
Glasgow City Council's Affordable Housing Supply Programme (AHSP) facilitated the completion of over 1,000 new affordable homes in the city during the past year, despite facing budgetary reductions at the start of the financial year.
The initial grant of £78.687 million from the Scottish Government

14/04/2025
A key phase of Scottish Water's £11.5 million project to upgrade a strategic rising sewer main connecting Renfrew and Glasgow is set to begin, resulting in a significant road closure.
From Monday, 28 April 2025, Ferry Road in Renfrew will be closed to all vehicular traffic for a period of four mont