Scottish Water has announced the successful completion of a £307,000 solar scheme in Moffatt.
The project has seen 324 ground mounted PV (photovoltaic) panels installed at the borehole site in Moffat, where raw water is pumped to the water treatment works before going on to supply customers in local area. It is set to generate 0.14GWh of green energy per year – enough boil over 622,000 kettles a year.
The renewable energy generated by the solar panels will meet 12 per cent of the site's power usage, saving 17 tonnes of carbon annually and supporting Scottish Water's drive to reach net zero emissions by 2040.
The project has been led by Scottish Water Horizons, the public utility's commercial subsidiary, and delivered by contractor R&A Group.
Scottish Water Horizons Project Manager Padmini Maheshwari said: "We are delighted this project is now complete in Moffat and it joins a growing number of solar power schemes based at Scottish Water assets around the country.
"The increasing impact of the climate crisis is being felt across Scottish Water's operations and serves to highlight the urgent need to reduce emissions. Our solar energy programme is an important facet in our drive to net zero and we are continuing to ramp up the scale and pace of delivering these projects."
Scottish Water Operations Team Leader Ricky Henderson added: "Due to the height and distance that these pumps have to push the water to get it to the treatment works, the power consumption at this site is significant.
"It is great that some of this energy usage is now going to be met by solar power and we will be reviewing the operation of the pumps to ensure we can maximise the energy generated by the scheme at peak production."
Construction News
12/09/2024
Scottish Water Completes £307,000 Moffatt Solar Scheme


24/04/2025
Offshore Solutions Group (OSG), a UK developer specialising in the floating offshore wind (FLOW) sector, has signed a two-year Exclusivity Agreement with Crown Estate Scotland for seabed areas in the Moray Firth.
This marks a significant step forward for OSG's groundbreaking FLOW-Park project.
Th

24/04/2025
Perth-based civil engineering firm I & H Brown has commenced construction on the first phase of a pioneering tyre recycling plant at the Port of Sunderland for new client, Wastefront.
This landmark project, known as Project Arrow, marks the UK's first facility of its kind, with the potential to re

24/04/2025
Hitachi Energy and SP Energy Networks (SPEN) have formalised their commitment to Scotland's energy transition by signing a Memorandum of Understanding (MoU) focused on deploying sustainable critical energy infrastructure.
The agreement will see Hitachi Energy supply switchgear from its innovative E

24/04/2025
Land surrounding the popular Inchgarth Reservoir in Aberdeen has undergone biodiversity improvements aimed at creating a better habitat for wading and farmland birds, while also protecting and enhancing the local ecosystem.
Scottish Water, the owner and operator of Inchgarth Reservoir, collaborated

24/04/2025
Prime Minister Rishi Sunak has today unveiled an initial £300 million funding package, allocated through Great British Energy ahead of the Spending Review, to bolster supply chains for the burgeoning offshore wind sector.
The funding will be made available through a grant application process, open

24/04/2025
Mountain bikers are once again able to enjoy the trails at Forestry and Land Scotland's (FLS) Carron Valley following the completion of significant upgrade works.
The site, renowned for offering some of the best official mountain biking trails in close proximity to Glasgow, has undergone resurfacin

24/04/2025
Aberdeen-headquartered Wood Group, a global leader in consulting and engineering, has been awarded two new engineering and procurement framework agreements worth $11 million (approx £8.3m) by TotalEnergies EP Ratawi Hub in Iraq.
The contracts form part of the Gas Growth Integrated Project (GGIP),

24/04/2025
Ayrshire Housing has appointed Scott Cunningham as its new Director of Assets and Compliance, a key role created to oversee a substantial £11.4 million investment in its housing stock over the next five years.
The housing association's recently launched Business Plan 2030 outlines this significant

24/04/2025
Hillcrest has announced the appointment of John Alexander as its new Chief Executive, with his tenure set to begin in early Summer 2025.
John Alexander currently serves as the Head of Local Authorities within SSEN Transmission and brings a wealth of experience from a diverse range of sectors at bot

24/04/2025
South Ayrshire Council's Thriving Communities team is continuing its vital work in supporting local community councils to develop Community-Led Action Plans across the region.
These action plans serve as a blueprint for each community, outlining a shared vision, identifying key local priorities, an