Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 14,696 companies....

Construction News

13/08/2024

JR Scaffold Services Appointed To Parklane Groups First Scottish Project

Construction News Image
JR Scaffold Services has been appointed to a milestone project by the Parklane Group to transform a vacant hotel in Glasgow's West End into new luxury student accommodation.

The development is the first project Parklane Group has undertaken north of the border.

The former three-star Lorne Hotel, located on the corner of Glasgow's Derby Street and Sauchiehall Street comprises two distinct buildings which adjoin each other in the prominent west end location.

The Lorne Hotel which has benefited from many upgrades and extensions over the years, features an existing Grade A listed building to the rear, with a larger, more prominent, extended building built in the 1960's to the front.

The main body of the modern building will see full renovation works internally, as well as a new external façade, transforming into 147 studio apartments. The older part of the building, which is Grade A listed, will also benefit from some minimal stone repair and a new slated roof as well as some internal works.
-- Advertisement --
NorthernAsbestosServicesLtd



Evan Horne of JR Scaffold Services, said: "The Lorne Hotel has seen many facelifts and extensions over the years from the Edwardian and Victoria eras, right through to the 1960's, so the mix of building materials and the fabric of the buildings are quite complex. The brief is to refurbish, repair and regenerate this iconic city property into luxury student accommodation, as well as visually improving and embedding the building into the local urban fabric, whilst also drastically improving its thermal performance.

"Our scaffolding will provide access for the full new fabrication of the building façade as well as for the roofing works, and the installation of the new windows.

"The scaffolding will also enable the creation of the new steel super structure for the extension at rear and the new level planned for this iconic building. It will also act as an overall edge protection to many areas.

"The team on site will be continually stripping and rebuilding the scaffolding structure as the project progresses to assist with its redevelopment.

"We are delighted to have been awarded this contract from Parklane Group and are excited to see the finished result once this fantastic building in a prominent location in Glasgow's West End has been brought back to life."

Work began earlier this year with three full-time members of the JR Scaffold Services team on site until early 2025.

Latest Construction News

16/04/2025
Construction work on the £5 million repair and refurbishment project at the Loch Centre in Tranent is scheduled to commence in June 2026. East Lothian Council has announced the anticipated start date for the significant upgrade to the well-used community facility. Under the current timetable, the
16/04/2025
A £636,000 project to install solar panels at the Gorbals water pumping station in South Ayrshire has been successfully completed. The scheme aims to provide a renewable energy source for pumping water to thousands of customers in the region. The project involved the installation of 793 solar pan
16/04/2025
A planning application has been lodged with Glasgow City Council by The JR Group, acting on behalf of Wheatley Group, for the construction of 29 much-needed affordable homes in the Baillieston area of the city. The proposed development on Caledonia Road will offer a mix of one- and two-bedroom apa
16/04/2025
Residents in 20 blocks of flats across Coatbridge are already experiencing the positive impacts of a recently completed, ambitious energy efficiency refurbishment project. The extensive construction work has delivered significant improvements to the properties, including the installation of cavity
16/04/2025
Ground investigation works are commencing this month at the proposed site for Orkney Islands Council’s Scapa Deep Water Quay at Deepdale in Holm. These initial investigations will be followed by marine-based site investigation works scheduled to begin in June. These works form part of the Pre-Con
16/04/2025
Construction work has been finalised on a significant new housing development in Motherwell town centre, delivering 42 newly built, highly energy-efficient flats alongside the respectful conversion of the B-Listed YMCA building into a further six homes. The project, part of North Lanarkshire Council
16/04/2025
The Construction Industry Training Board (CITB) has today released its year-end performance data for its New Entrant Support Team (NEST), revealing a significant increase in apprenticeship starts. During the financial year 2024-25, NEST supported 4,128 individuals in commencing apprenticeships, a su
16/04/2025
A water-powered mill in Angus is set to grind grain once again after receiving a record-breaking donation to fund its restoration. The National Trust for Scotland has announced that a long-time member of the conservation charity has gifted an incredible £2.4 million, one of the largest single dona
15/04/2025
Construction of a £70 million student accommodation development at 292-298 St Vincent Street in Glasgow has reached a significant milestone, with the building now visibly rising from the ground. Drone footage has captured the progress of the project, which is a partnership between developer Artisa
15/04/2025
Energy regulator Ofgem is expected to confirm today (April 15) its finalised Connections Reform process, designed to expedite grid connections for renewable energy projects that are ready and crucial for achieving the UK's clean power targets for 2030 and beyond. The new connections system, anticip
Morris & Spottiswood LtdRBT Underfloor LimitedEuro-Fab (Scotland)Caldwell Cleaning ServicesBairds Windows LtdP. McCann Landscaping & DrivewaysIMS Heat PumpsClaymore Training LimitedRural House LtdJames Smith Fencing Ltd