Refurbishment work has been completed at Stonehaven Leisure Centre in Aberdeenshire.
The building has reopened following an extensive £1.4million refurbishment and renovation works. Visitors are invited to explore the newly updated facilities at the centre. The venue features a new fitness suite, a new studio, a renewed sports hall, a refurbished poolside and changing village equipment with a fully accessible “changing places” changing space.
The gym is kitted out with the latest fitness equipment from Pulse Fitness and Ingido Fitness and a full-time instructor. Additionally, the Fitness Studio offers over 30 group exercise classes per week of new classes suited to all fitness levels and interests, including group cycle, barbell blast, gym class, light movers, and Pilates.
The Sports Hall has been repainted, with the floor given a new lease of life from sand and re-seal, and is ready for the returning clubs to use. The refurbishment also includes upgraded changing areas and a PAMIS changing places facility, which provides accessible changing facilities for individuals with special needs and disabilities.
The £1.4 million refurbishment follows a participatory budgeting exercise, reflecting the strong support from the local community.
Cllr Anne Stirling, chair of the council’s Communities Committee, said: "The investment in Stonehaven Leisure Centre has been a collaborative effort driven by community feedback. The upgraded facilities and new programmes will offer valuable opportunities for everyone to engage in physical activity and enhance their well-being. We’re proud to deliver a project that aligns with the needs and aspirations of our local community."
The centre is open weekdays from 7am through to 8pm and 9am-3pm at the weekend.
The indoor swimming pool will reopen from August 19 with access for Learn to Swim classes and swimming clubs being able to utilise the pool.
The centre will have new opening hours from September 2, with weekday openings from 6.30am through to 9pm, and 8.30am-5pm at the weekend. This will also see the full reopening of the indoor swimming pool for all visitors as the Stonehaven Open Air Lido season comes to a close. There are, however, plans to trial cold-water swimming in the lido.
New health services are also running at the centre, including a free 12-week exercise referral programme for overall health improvement and a free 12-week counterweight programme to promote healthy habits and active lifestyles.
Construction News
26/07/2024
Refurb Work Complete At Stonehaven Leisure Centre


15/04/2025
Construction of a £70 million student accommodation development at 292-298 St Vincent Street in Glasgow has reached a significant milestone, with the building now visibly rising from the ground.
Drone footage has captured the progress of the project, which is a partnership between developer Artisa

15/04/2025
Energy regulator Ofgem is expected to confirm today (April 15) its finalised Connections Reform process, designed to expedite grid connections for renewable energy projects that are ready and crucial for achieving the UK's clean power targets for 2030 and beyond.
The new connections system, anticip

15/04/2025
The ambitious transformation of Glasgow’s landmark George Square has moved into a tangible phase with the commencement of the erection of hoardings around the perimeter of the civic space. Starting today, the hoardings will enclose the Square for the duration of its 18-month redevelopment.
The pane

15/04/2025
Members of the public are invited to attend a consultation feedback event to discuss the proposed infrastructure associated with a new underground electricity transmission cable between the Kinardochy and Errochty substations in Perthshire.
The event will take place on Monday, 28 April, from 4 pm t

15/04/2025
Turner & Townsend have been appointed as project managers to develop a business case for the potential extension of the Borders Railway beyond its current terminus at Tweedbank to Hawick and Carlisle.
This key appointment will enable crucial work to progress on the project, including feasibility s

15/04/2025
Arran Community Renewables, a Community Benefit Society based on the Isle of Arran, has secured planning consent for a 6 MW solar farm. The Glenkiln Solar Farm, located approximately 1km west of Lamlash, is projected to generate 5,600MWh of clean renewable energy annually from 2027.
The £5 million

15/04/2025
A new Route Map has been published by the Scottish Land Commission (SLC) to ensure communities across Scotland secure tangible and long-lasting benefits from nature restoration projects and investment in the country's natural environment.
The practical guide is designed for landowners, developers,

15/04/2025
Award-winning principal contractor Procast Group has further expanded its presence across Scotland with the opening of a new base in Dumfries. The Hamilton-based firm has invested £30,000 in a new warehouse and office facility in the Maxwelltown Industrial Estate in Dumfries and Galloway, marking it

14/04/2025
Glasgow City Council's Affordable Housing Supply Programme (AHSP) facilitated the completion of over 1,000 new affordable homes in the city during the past year, despite facing budgetary reductions at the start of the financial year.
The initial grant of £78.687 million from the Scottish Government

14/04/2025
A key phase of Scottish Water's £11.5 million project to upgrade a strategic rising sewer main connecting Renfrew and Glasgow is set to begin, resulting in a significant road closure.
From Monday, 28 April 2025, Ferry Road in Renfrew will be closed to all vehicular traffic for a period of four mont