Construction News
19/06/2024
Glasgow Central Quay Development Approved
![Construction News Image](https://www.buildscotland.co.uk/newsimages/1_309152_Glasgow-Central-Quay.jpg)
Regeneration specialist, Summix Capital, has been granted planning permission for the delivery of a new low-carbon mixed-use development at Central Quay in Glasgow by councillors on the Planning Applications Committee.
The granting of planning permission, subject to conditions, for this major urban renewal project, continues the regeneration of the Clyde riverside.
Adjacent to the existing high-quality office building at 2 Central Quay, the brownfield-site development will include residential, purpose-built student accommodation (PBSA), and commercial uses (including food /drink and retail uses), with associated landscaping / public realm, parking and access to a range of sustainable travel options.
Ideally located between the city centre and the west end at Anderston, the sustainable, low-carbon mixed-use development, is immediately adjacent to Finnieston, one of Glasgow’s fastest-growing neighbourhoods.
Boasting excellent transport links, the development continues the significant transformation of this location from vacant, derelict former industrial land, to one which will create a new residential neighbourhood, assisting in tackling the Council’s declared housing emergency.
Central Quay will provide four building blocks, comprising a range of uses that will deliver a truly mixed community. This includes 409 private-for-sale (PFS) units, a 934-bed PBSA building, and retail/commercial space.
The design of the new neighbourhood is aiming to meet recognised net zero carbon standards in operation. It includes features to reduce embodied carbon through its choice of materials, plus extensive use of renewable energy, such as air source heat pumps and solar PV, as well as sustainable urban drainage.
Biodiversity will be enhanced through new planting, including increased tree planting, with high-quality green spaces and open spaces, benefiting both new residents and the wider community. It will also include roof gardens, children’s play areas and a new public plaza.
Delivering £7.7 million of resident and visitor expenditure annually on goods and services, it is estimated that the development will support 115 jobs, with around 650 jobs directly created per annum in the construction of the overall scheme.
The site already benefits from planning permission in principle for a mixed-use development. This includes offices, residential, hotel, and associated ground floor commercial uses with access, parking, landscaping and associated works.
Stuart Black, Development Director for Summix Capital, said:
"We are delighted to have received planning permission for this exciting low-carbon development.
"This truly mixed-use scheme represents a significant investment in Glasgow, assisting in tackling the housing emergency through providing much-needed housing and best-in-class student accommodation, as well as commercial space.
"The development of the brownfield site will continue the significant transformation of this location from vacant, derelict former industrial land, to one which will create a new residential neighbourhood.
"We look forward to continue working with the local community and the Council as we progress the delivery of this."
The granting of planning permission, subject to conditions, for this major urban renewal project, continues the regeneration of the Clyde riverside.
Adjacent to the existing high-quality office building at 2 Central Quay, the brownfield-site development will include residential, purpose-built student accommodation (PBSA), and commercial uses (including food /drink and retail uses), with associated landscaping / public realm, parking and access to a range of sustainable travel options.
Ideally located between the city centre and the west end at Anderston, the sustainable, low-carbon mixed-use development, is immediately adjacent to Finnieston, one of Glasgow’s fastest-growing neighbourhoods.
Boasting excellent transport links, the development continues the significant transformation of this location from vacant, derelict former industrial land, to one which will create a new residential neighbourhood, assisting in tackling the Council’s declared housing emergency.
Central Quay will provide four building blocks, comprising a range of uses that will deliver a truly mixed community. This includes 409 private-for-sale (PFS) units, a 934-bed PBSA building, and retail/commercial space.
The design of the new neighbourhood is aiming to meet recognised net zero carbon standards in operation. It includes features to reduce embodied carbon through its choice of materials, plus extensive use of renewable energy, such as air source heat pumps and solar PV, as well as sustainable urban drainage.
Biodiversity will be enhanced through new planting, including increased tree planting, with high-quality green spaces and open spaces, benefiting both new residents and the wider community. It will also include roof gardens, children’s play areas and a new public plaza.
Delivering £7.7 million of resident and visitor expenditure annually on goods and services, it is estimated that the development will support 115 jobs, with around 650 jobs directly created per annum in the construction of the overall scheme.
The site already benefits from planning permission in principle for a mixed-use development. This includes offices, residential, hotel, and associated ground floor commercial uses with access, parking, landscaping and associated works.
Stuart Black, Development Director for Summix Capital, said:
"We are delighted to have received planning permission for this exciting low-carbon development.
"This truly mixed-use scheme represents a significant investment in Glasgow, assisting in tackling the housing emergency through providing much-needed housing and best-in-class student accommodation, as well as commercial space.
"The development of the brownfield site will continue the significant transformation of this location from vacant, derelict former industrial land, to one which will create a new residential neighbourhood.
"We look forward to continue working with the local community and the Council as we progress the delivery of this."
![](https://www.buildscotland.co.uk/newsimages/1_316023_constructionworker.jpg)
06/02/2025
The number of building projects being submitted by Scotland's public bodies to the Construction Pipeline Forecast Tool has continued to grow, with 12 more organisations now registered on the platform.
The Tool, deve
![](https://www.buildscotland.co.uk/newsimages/1_316013_glasgow.jpg)
06/02/2025
Glasgow City Council has opened applications for funding from the Scottish Government's Vacant and Derelict Land Fund.
The funding, totalling £1.907 million, will be made available to local organisations, including charities, community groups, and housing associations, to deliver projects that redu
![](https://www.buildscotland.co.uk/newsimages/1_316019_jcb-dualdrive.jpg)
06/02/2025
B&K Hume Groundworks, a leading civil engineering and groundworks contractor based in Greenlaw, has purchased one of the first JCB DualDrive backhoe loaders in Scotland.
The company acquired the new JCB 4CX Pro DualDrive machine from Scot JCB. The machine features unique pearlescent orange paintwor
![](https://www.buildscotland.co.uk/newsimages/1_316011_ayrshire-collegee.jpg)
06/02/2025
Ayrshire College and South Ayrshire Council's Property Maintenance department have launched a new work experience programme designed to foster a sustainable talent pipeline within the local joinery sector.
The initiative provides Ayrshire College Carpentry and Joinery students with the opportunity
![](https://www.buildscotland.co.uk/newsimages/1_316018_clark.jpg)
06/02/2025
Clark Contracts has completed the construction of a new Sky VIP lounge at the OVO Hydro in Glasgow.
The project involved the construction of the base build for the lounge, which spans around a third of the perimeter of the Hydro bowl.
"We are delighted to have completed a 3rd project within this i
![](https://www.buildscotland.co.uk/newsimages/1_316021_dumfries.jpg)
06/02/2025
The new build project at Dumfries High School has reached a significant milestone with the opening of a new sports pitch.
The £50m project is currently underway and on schedule for completion by April 2026. Once the new school is operational, phase 3 will commence, including the demolition of the o
![](https://www.buildscotland.co.uk/newsimages/1_316017_skills.jpg)
06/02/2025
Registrations are now open for SkillBuild, the UK's largest and longest-running multi-trade skills competition, delivered by the Construction Industry Training Board (CITB).
The competition provides a platform for apprentices and trainees to showcase their skills across a range of construction trad
![](https://www.buildscotland.co.uk/newsimages/1_316016_select.jpg)
06/02/2025
SELECT, the electrical contracting trade association, has released an in-depth guidance video to raise awareness of the dangers of Neutral Current Diversion (NCD).
The video, produced in partnership with the Institution of Engineering and Technology (IET), provides a step-by-step guide to identifyi
![](https://www.buildscotland.co.uk/newsimages/1_316014_scottish-renewables.jpg)
06/02/2025
Scottish Renewables, the industry body for renewable energy in Scotland, has announced the appointment of three new Directors to its Board.
Finley Becks-Phelps (Fred. Olsen Renewables), Alwyn Poulter (Hitachi Energy), and Sarah McIntosh (Muirhall Energy) were elected by the organisation's 360+ memb
![](https://www.buildscotland.co.uk/newsimages/1_316010_st-ninians.jpg)
06/02/2025
The regeneration of St Ninians in Stirling has taken a significant step forward with the approval of plans to begin the process of appointing a contractor for a new housing development.
Stirling Council has given the green light to proceed with the procurement process for a builder to develop a sit