Build Scotland Construction Directory
Time and date
CONSTRUCTION DIRECTORY
Share this page
Construction News
05/10/2023

Work On Private Hospital In Granton Complete

Construction News Image
A state-of-the-art independent private hospital specialising in cosmetic and plastic surgery has been completed at Granton on the outskirts of Edinburgh.

The Waterfront Hospital, owned and managed by consultant plastic surgeons Awf and Omar Quaba, has been designed by award-winning NVDC Architects which has a wealth of design experience across the health, surgical and dental sectors.

Following an initial search, NVDC founder Farahbod Nakhaei viewed several shortlisted properties in Edinburgh which were suitable for redevelopment, helping to appraise each for suitability, as well as potential limitations.

The chosen building in Granton had originally been part of a Morrisons supermarket development but had remained empty and unutilised for over 14 years. The building offered huge potential and its development will now contribute to the wider regeneration of the area.

Harnessing their previous experience in delivering private surgical facilities, the team at NVDC, led by Farahbod Nakhaei and Project Architect Anna Dach, produced the successful design as part of a competitive pitch process.

A key component of the client brief, in addition to being fully Scottish Health Technical Memorandum (SHTM) compliant, the design was to include one fully SHTM compliant general anaesthesia operating suite, a second operating theatre for local anaesthesia, treatment rooms and other ancillary spaces and a generous waiting area that could be used for educational purposes.

-- Advertisement --
NorthernAsbestosServicesLtd

Incorporating several complex design elements, including a bespoke staircase connecting the two main floors and following the curve of the external facade, the new private hospital is scheduled to be open to patients in early September.

Farahbod Nakhaei, founder at NVDC, said: "Having delivered several projects of a similar nature we understood the complexities of adhering to rigorous SHTM guidelines and building regulations. We were able to combine our understanding and passion to create a truly amazing and uplifting space which reflects the high standards of treatment and care provided by the client.

"Awf and Omar Quaba share our passion and ethos of creating spaces which promote and enhance both the physical and mental wellbeing."

The Waterfront Hospital features a cutting-edge building management system (BMS) with the ability to control and monitor the entire building environment to maintain the highest clinical standards.

As well as controlling and maintaining air changes, and required pressures, the BMS also controls the entire building’s mechanical and electrical services, such as access, ventilation, heating, lighting, medical gases and power.

Another key requirement of a complex building such as this is controlling access to various parts of the building. NVDC researched and specified the access control system ensuring the chosen system had the required functionality while in-keeping with the overall design of the building.

The NVDC team worked extensively with M&E consultants, Charles Scott & Partners, contractor Souness and Boyne, the access control manufacturers and client’s IT team to ensure the system could provide the complex array of requirements for managing the different levels of access to various parts of building. The access control system and the BMS can each be controlled via a mobile phone app.

The entire roof space has also been adapted to house necessary plant equipment. As part of their design, NVDC included a prefabricated modular rooftop plantroom which would house plant equipment in a weatherproof environment.

NVDC was instrumental in the design of an energy efficient lighting system operated by movement-controlled PIR sensors. As an integral part of the building design, NVDC worked closely with lighting engineers to develop a lighting design which promotes ease of flow throughout the building.

Latest Construction News

26/11/2024

Scottish Water has unveiled its largest-ever procurement initiative, aiming to modernise the nation's water and wastewater infrastructure while safeguarding the environment. The program, named Delivery Vehicle 4, is valued between £5 billion and £9 billion and is set to run from 2027 to 2033, with ...
26/11/2024

The City of Edinburgh Council has granted planning permission, subject to conditions, for the refurbishment of Calton Square, an office building currently occupied by Baillie Gifford until the end of December 2025. Promoted by Ardstone Capital on behalf of Manova Partners, the project aims to ...
26/11/2024

First Minister John Swinney, MSP for Perthshire North, praised the progress being made on the construction of the new Perth High School during a visit on Friday, 22 November. He was joined by Jim Fairlie, MSP for Perthshire South and Kinross-shire, alongside senior Perth and Kinross Councillors, ...
26/11/2024

A state-of-the-art playpark has officially opened at King George V Park in Bearsden, following the completion of a £100,000 refurbishment. Funded by a combination of East Dunbartonshire Council (EDC) Capital Funding and the Scottish Government’s Renewing Scotland’s Play Parks initiative, the ...
26/11/2024

Fife Council has launched a public consultation, inviting residents, businesses, and organizations to contribute ideas and propose sites for inclusion in the next Local Development Plan, known as Fife's Place Plan. The council is calling on community councils, landowners, and developers to share ...
26/11/2024

The Chief Executive of East Lothian Council has announced she is to retire in February 2025. Monica Patterson who has been Chief Executive for almost five years, has spent most of her professional career working in local government. Prior to joining East Lothian Council in 2010, she was Head of ...
25/11/2024

West of Scotland Housing Association (WSHA) and Connect Modular have jointly submitted a planning application to Glasgow City Council for the development of 33 affordable homes in Cowlairs. This project aligns with the wider Cowlairs Park regeneration scheme and the city's ambitious housing ...
25/11/2024

Arc-Tech (Scotland) has successfully completed a £6m Mechanical and Electrical (M&E) services package for the Lost Shore Surf Resort in Edinburgh. The state-of-the-art resort, which opened its doors earlier this month, features a range of amenities, including a wave pool, luxury lodges, and ...
25/11/2024

Scottish Water has successfully completed the construction of a groundbreaking hydro energy generation scheme at Whiteadder Reservoir in East Lothian. This innovative project, believed to be the first of its kind in Europe, will harness the power of water to offset a significant portion of the ...
25/11/2024

Work is set to commence on a £6.5 million project to upgrade the Double Dykes Gypsy/Traveller site near Perth. The initiative aims to replace outdated chalets with modern, energy-efficient accommodation and implement significant site improvements. Perth & Kinross Council secured £3.9 million from ...
Morris & Spottiswood LtdRBT Underfloor LimitedSolway Ecology Consulting LtdPerfect View Aerial FilmingBurnside Plant Hire LtdSips Eco Panel Systems LtdM K M Building Supplies LtdAlternative Tying Systems LtdContainexPerthshire Joinery Ltd
Terms and Conditions
2024/11/27 01:14:32