S Harrison Developments has proposed a £100 million residential-led development at Ocean Point 2 in Leith, as part of the ongoing transformation of the Waterfront.
Neighbouring Ocean Point 1, the development of the brownfield site will provide two buildings and comprise a mix of build-to-rent homes (BTR), including apartments specifically for families, alongside purpose-built student accommodation (PBSA), delivering a truly mixed community.
In total, 120 BTR homes are proposed, providing a mix of studio, one-bed, two-bed and three-bed apartments to meet a range of housing needs. A quarter of these are three-bed apartments, designed for families.
There are 404 PBSA beds on offer, split between cluster accommodation and studio bedrooms. The former accommodation is intended to be a mix of five and six bedrooms.
Student numbers have risen significantly in the city over recent years, with full-time student number growing by more than a quarter (25.1 per cent) between 2016/17 and 2021/22.1 PBSA, of which there is little in the Leith area, has the potential to free-up much needed family homes locally currently occupied by students.
Commercial space/co-working and amenity space are also proposed as part of Ocean Point 2, offering fantastic active frontage to Ocean Drive, with greatly enhanced public realm encouraging active lifestyles.
In addition to delivering homes, the new development will deliver significant local spend, amounting to some £5.3 million by residents and visitors annually, supporting an estimated 60 retail and leisure jobs. It has been estimated that 325 jobs will be created directly in the construction of the overall scheme.
The development neighbours Ocean Terminal, which is set to undergo a £100 million transformation, delivering a mixed-use development comprising residential, commercial, retail and hospitality.
The extension of the tram line between Edinburgh and Ocean Terminal also provides connectivity between the development and Edinburgh city centre within20 minutes.
Harrison has a long pedigree of working in the city, ranging from delivering the Malmaison at St Andrew Square to student developments at Westfield and Gorgie and hotel development at Osborne House, Haymarket.
A spokesperson for Harrison Developments commented: "Our proposed development, if approved, will bring much-needed homes and student accommodation to an area which is undergoing a rapid transformation, delivering a truly mixed community.
"Regenerating a current brownfield site, this development boasts excellent transport links, especially with the new tram line, and will deliver a significant investment into the local community."
Planning and development consultancy Turley provided planning services for the project with CDA acting as architects.
Construction News
13/09/2023
New £100m Leith Residential Development Proposed


15/04/2025
Construction of a £70 million student accommodation development at 292-298 St Vincent Street in Glasgow has reached a significant milestone, with the building now visibly rising from the ground.
Drone footage has captured the progress of the project, which is a partnership between developer Artisa

15/04/2025
Energy regulator Ofgem is expected to confirm today (April 15) its finalised Connections Reform process, designed to expedite grid connections for renewable energy projects that are ready and crucial for achieving the UK's clean power targets for 2030 and beyond.
The new connections system, anticip

15/04/2025
The ambitious transformation of Glasgow’s landmark George Square has moved into a tangible phase with the commencement of the erection of hoardings around the perimeter of the civic space. Starting today, the hoardings will enclose the Square for the duration of its 18-month redevelopment.
The pane

15/04/2025
Members of the public are invited to attend a consultation feedback event to discuss the proposed infrastructure associated with a new underground electricity transmission cable between the Kinardochy and Errochty substations in Perthshire.
The event will take place on Monday, 28 April, from 4 pm t

15/04/2025
Turner & Townsend have been appointed as project managers to develop a business case for the potential extension of the Borders Railway beyond its current terminus at Tweedbank to Hawick and Carlisle.
This key appointment will enable crucial work to progress on the project, including feasibility s

15/04/2025
Arran Community Renewables, a Community Benefit Society based on the Isle of Arran, has secured planning consent for a 6 MW solar farm. The Glenkiln Solar Farm, located approximately 1km west of Lamlash, is projected to generate 5,600MWh of clean renewable energy annually from 2027.
The £5 million

15/04/2025
A new Route Map has been published by the Scottish Land Commission (SLC) to ensure communities across Scotland secure tangible and long-lasting benefits from nature restoration projects and investment in the country's natural environment.
The practical guide is designed for landowners, developers,

15/04/2025
Award-winning principal contractor Procast Group has further expanded its presence across Scotland with the opening of a new base in Dumfries. The Hamilton-based firm has invested £30,000 in a new warehouse and office facility in the Maxwelltown Industrial Estate in Dumfries and Galloway, marking it

14/04/2025
Glasgow City Council's Affordable Housing Supply Programme (AHSP) facilitated the completion of over 1,000 new affordable homes in the city during the past year, despite facing budgetary reductions at the start of the financial year.
The initial grant of £78.687 million from the Scottish Government

14/04/2025
A key phase of Scottish Water's £11.5 million project to upgrade a strategic rising sewer main connecting Renfrew and Glasgow is set to begin, resulting in a significant road closure.
From Monday, 28 April 2025, Ferry Road in Renfrew will be closed to all vehicular traffic for a period of four mont