Civil engineering contractor, O'Keefe, has announced the successful completion of extensive ground improvement works for a port development near Inverness.
The owner of the site, Haventus, is redeveloping the 450-acre Ardersier Port as an energy transition facility to serve offshore wind farms and other energy projects.
Ardersier, a former North Sea oil and gas fabrication yard, closed in 2001 and prior to the commencement of the current project, was the UK's largest brownfield port.
O'Keefe has carried out extensive cement stabilisation works to create a new 1.5km-long haul road ready for the main construction works.
Using a highly-specialised German-built Wirtgen WR250 soil stabiliser, O'Keefe has mixed approximately 1,500 tonnes of cement into the sandy soil and spread a 150mm layer of crushed concrete over the top. The cemented crush concrete offers a more robust layer as stabilised material is not a wearing course.
Soil stabilisation, using either lime or cement, is a well-proven method of transforming unstable cohesive soils into a stiff granular texture capable of bearing dynamic and static loads.
Brian Doogue, O'Keefe's Soil Contracts manager, explained: "Cement stabilisation allows us to use site-won material rather than bring in thousands of tonnes of expensive aggregate. It's cheaper and more environmentally-friendly.
"We built the haul road to a precise design, with a camber in the middle to shed water. The road consists of cement-stabilised soil to a depth of 300mm with a layer of crushed concrete bringing the total depth to 450mm", added Mr Doogue.
Preparatory works began last year with site visits and the testing of soil samples. O'Keefe's soil engineering specialists then designed a mix to suit the site conditions.
"There is no water supply on site, but we're right by the sea, so we designed a recipe that can cope with the salt in the water," explained Mr Doogue.
Work on the soil improvement began in late May and was completed in mid July, some two weeks ahead of schedule. Besides the Wirtgen machine, O'Keefe used an articulated dump truck to carry materials and a Caterpillar D6 bulldozer with GPS machine control to profile and level the road surface.
The finished surface was compacted with a 16-tonne single-drum vibrating roller.
"We finished early and everything is done, bar the plate load testing, which is happening now," said Mr Doogue.
"O'Keefe has a strong track record in this type of work – we've been doing it for more than 20 years. This project demonstrates how our stabilisation and earthworks teams can deliver a nation-wide service," he concluded.
Time and date
CONSTRUCTION DIRECTORY
Construction News
10/08/2023
O'Keefe Completes Groundworks For Ardersier Port Development
Latest Construction News
22/11/2024
SP Energy Networks has announced a major investment in Britain's electricity grid, selecting 19 preferred partners to deliver a £5.4bn supply chain programme. This significant initiative aims to meet increasing energy demand and facilitate future growth. The selected companies, many of which are ...
22/11/2024
Edinburgh City Council has launched a 12-week public consultation on a new strategy to revitalise Princes Street and the wider Waverley Valley. The vision aims to create a more vibrant and welcoming city centre, attracting investment, supporting businesses, and enhancing the visitor ...
22/11/2024
Ener-G Services Limited, a leading UK electrical engineering company specialising in renewables, marine, and offshore sectors, has expanded its operations in Westhill, Aberdeenshire. The company has leased Unit 6E at Kingshill Commercial Park, a 2,500 sq ft space, on a 5-year lease. This new ...
22/11/2024
A consortium of leading scientists, industry experts, and academic institutions has joined forces to accelerate Scotland's offshore wind sector. The £2.5 million project, led by the University of Edinburgh in collaboration with the University of Dundee and the Forth and Tay Offshore cluster (FTO), ...
22/11/2024
The Port of Aberdeen and Turner & Townsend were highly commended in the 'Engineering, Construction & Infrastructure Project of the Year' category at the APM Project Management Awards 2024. The award recognises excellence in project management and the positive impact on end-users. The £420 million ...
22/11/2024
South Lanarkshire Council's £10 million fire safety improvement programme has reached a significant milestone, with CCG (Scotland) completing installations in over 1,700 high-rise residences across East Kilbride and Cambuslang. The Glasgow-based construction firm has been working closely with the ...
22/11/2024
SSEN Transmission, a key player in the UK's energy transition, is set to further expand its workforce and move into a new, sustainable office space in Glasgow. The company's commitment to net zero and the increasing demand for green energy workers has led to significant growth, with the number of ...
22/11/2024
Scottish Water is investing in the upgrade of its Loch Eck clean water plant in Dunoon. The project involves replacing outdated dry well pumps with new, more reliable pumps capable of operating in both wet and dry conditions. WGM Engineering, an RSK Group company, has been tasked with carrying out ...
22/11/2024
Scottish Land & Estates has expressed serious concerns over the Scottish Government's Land Reform Bill, particularly the provisions that would allow ministers to force landowners to sell large estates in lots. Sarah-Jane Laing, the organisation's chief executive, stated that while the land-based ...
22/11/2024
Clark Contracts employees have once again shown their commitment to community engagement by volunteering at Silverburn Park in Leven. On Thursday, 21st November, 16 members of the team spent their day planting over 400 trees and carrying out other landscaping tasks. This latest volunteering effort ...