Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 14,696 companies....

Construction News

12/08/2022

£3.8m Gairnshiel Bridge Construction Works To Start

Construction News Image
Aberdeenshire Council has announced a two-week road closure at Gairnshiel ahead of new £3.8million bridge construction works.

The council said that the closure is necessary to carry out essential works to the existing A939 which will improve road alignment sufficiently to facilitate delivery of the new bridge deck and to allow passage of the large crane which will be required to lift the new deck into position.

All changes made to the existing road will be permanent which will also contribute towards improved road safety in this location in the longer term.
-- Advertisement --
NorthernAsbestosServicesLtd



The signed diversion route will be from the A93/A939 junction, east along the A93 to Dinnet, then north along the A97 to Strathdon, then west along the A944 to re-join the A939 at Colnabaichin.

Earlier this year, Aberdeenshire Council awarded the £3.8m contract for the replacement crossing to Wills Bros Civil Engineering Ltd, with completion expected by Spring 2023.

The existing Grade A-listed structure – built in the mid-1700s – is no longer suitable for modern day traffic and with ever-increasing volumes of vehicles and larger, heavier loads, the bridge has suffered significant damage over many years. However this 'faithful old servant' will be retained for use by non-motorised users.

Its new downstream replacement will have two lanes of traffic and will be capable of carrying large goods vehicles.

This modern, yet sympathetic replacement will ensure local residents and visitors alike can continue to enjoy the delights the area has to offer while providing improved journey times and reliability.

Latest Construction News

16/04/2025
Construction work on the £5 million repair and refurbishment project at the Loch Centre in Tranent is scheduled to commence in June 2026. East Lothian Council has announced the anticipated start date for the significant upgrade to the well-used community facility. Under the current timetable, the
16/04/2025
A £636,000 project to install solar panels at the Gorbals water pumping station in South Ayrshire has been successfully completed. The scheme aims to provide a renewable energy source for pumping water to thousands of customers in the region. The project involved the installation of 793 solar pan
16/04/2025
A planning application has been lodged with Glasgow City Council by The JR Group, acting on behalf of Wheatley Group, for the construction of 29 much-needed affordable homes in the Baillieston area of the city. The proposed development on Caledonia Road will offer a mix of one- and two-bedroom apa
16/04/2025
Residents in 20 blocks of flats across Coatbridge are already experiencing the positive impacts of a recently completed, ambitious energy efficiency refurbishment project. The extensive construction work has delivered significant improvements to the properties, including the installation of cavity
16/04/2025
Ground investigation works are commencing this month at the proposed site for Orkney Islands Council’s Scapa Deep Water Quay at Deepdale in Holm. These initial investigations will be followed by marine-based site investigation works scheduled to begin in June. These works form part of the Pre-Con
16/04/2025
Construction work has been finalised on a significant new housing development in Motherwell town centre, delivering 42 newly built, highly energy-efficient flats alongside the respectful conversion of the B-Listed YMCA building into a further six homes. The project, part of North Lanarkshire Council
16/04/2025
The Construction Industry Training Board (CITB) has today released its year-end performance data for its New Entrant Support Team (NEST), revealing a significant increase in apprenticeship starts. During the financial year 2024-25, NEST supported 4,128 individuals in commencing apprenticeships, a su
16/04/2025
A water-powered mill in Angus is set to grind grain once again after receiving a record-breaking donation to fund its restoration. The National Trust for Scotland has announced that a long-time member of the conservation charity has gifted an incredible £2.4 million, one of the largest single dona
15/04/2025
Construction of a £70 million student accommodation development at 292-298 St Vincent Street in Glasgow has reached a significant milestone, with the building now visibly rising from the ground. Drone footage has captured the progress of the project, which is a partnership between developer Artisa
15/04/2025
Energy regulator Ofgem is expected to confirm today (April 15) its finalised Connections Reform process, designed to expedite grid connections for renewable energy projects that are ready and crucial for achieving the UK's clean power targets for 2030 and beyond. The new connections system, anticip
Morris & Spottiswood LtdRBT Underfloor LimitedHugh Simpson (Contractors) LtdTennants (Elgin) LtdCF Concrete PumpingPAUL Heat RecoveryAtlas Winch & Hoist Services LtdClaymore Training LimitedMulberry Kitchen DesignScaftec Ltd