Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 14,699 companies....

Construction News

03/08/2022

£20m Levelling Up Bid Aberdeen For Beach Rejuvenation

Construction News Image
Aberdeen City Council has submitted a £20million bid for plans to rejuvenate its beach area to the UK Government's Levelling Up Fund 2.

The plans for the beachfront include a pier, a playpark and other leisure facilities, attractive streetscaping, increased usability for the Beach Ballroom, and a state-of-the-art sports area.

The elements which are part of the Levelling Up Fund 2 bid include an urban park (including the new playpark, sports area, and a pump track), an events field, a gateway building, a hub building and canopy features, and a pedestrian ‘spine'.

The Levelling Up Fund 2 operates on a competitive basis, with a maximum of one project being funded per Westminster constituency and one strategic transport project per local authority.

Aberdeen City Council City Growth and Resources Convener Councillor Alexander McLellan said: "The plans for the beachfront are being designed to provide an exciting new environment for both residents and visitors to the city while conserving the heritage of the area and encouraging more people to make the shift to walking, cycling, or public transport.
-- Advertisement --
NorthernAsbestosServicesLtd



"The proposals are also centred around the need to recover from the Covid-19 pandemic in a positive way and ensure we are investing in our city and making it a place people want to live, work, visit and do business.

"We welcome the opportunity to bid to the UK Government's Levelling Up Fund 2 and the opportunity that presents to help fund our ambitious plans for the beach front, as we believe we are presenting a strong case to rejuvenate our beachfront and the benefits that will bring to our city and the people living here."

The proposed urban park would create an outdoor destination for the city and would also facilitate connections back to the city centre.

The playpark and sports area, which are being developed in on-going consultation with youngsters, could accommodate a variety of different play uses including a pump track which could be used by many different types of equipment including scooters, roller blades, roller skates, skateboards, bicycles of all types, and wheelchairs.

The proposed events field would be flexible space capable of holding events, festivals, larger concerts and would also have a large, grassed area for day-to-day use such as informal sports and games such as football, touch rugby, ultimate frisbee as well as providing space for picnicking.

The proposed gateway building would act as a sculptural landmark at the entrance to the events park, drawing people down towards the new waterfront destination from the city centre.

The proposed hub building would be in the central plaza area, creating a focal point at the heart of the new urban park and positioned at a key junction on the main pedestrian spine.

The pedestrian spine would consist of the main route through the area.

Latest Construction News

15/04/2025
Construction of a £70 million student accommodation development at 292-298 St Vincent Street in Glasgow has reached a significant milestone, with the building now visibly rising from the ground. Drone footage has captured the progress of the project, which is a partnership between developer Artisa
15/04/2025
Energy regulator Ofgem is expected to confirm today (April 15) its finalised Connections Reform process, designed to expedite grid connections for renewable energy projects that are ready and crucial for achieving the UK's clean power targets for 2030 and beyond. The new connections system, anticip
15/04/2025
The ambitious transformation of Glasgow’s landmark George Square has moved into a tangible phase with the commencement of the erection of hoardings around the perimeter of the civic space. Starting today, the hoardings will enclose the Square for the duration of its 18-month redevelopment. The pane
15/04/2025
Members of the public are invited to attend a consultation feedback event to discuss the proposed infrastructure associated with a new underground electricity transmission cable between the Kinardochy and Errochty substations in Perthshire. The event will take place on Monday, 28 April, from 4 pm t
15/04/2025
Turner & Townsend have been appointed as project managers to develop a business case for the potential extension of the Borders Railway beyond its current terminus at Tweedbank to Hawick and Carlisle. This key appointment will enable crucial work to progress on the project, including feasibility s
15/04/2025
Arran Community Renewables, a Community Benefit Society based on the Isle of Arran, has secured planning consent for a 6 MW solar farm. The Glenkiln Solar Farm, located approximately 1km west of Lamlash, is projected to generate 5,600MWh of clean renewable energy annually from 2027. The £5 million
15/04/2025
A new Route Map has been published by the Scottish Land Commission (SLC) to ensure communities across Scotland secure tangible and long-lasting benefits from nature restoration projects and investment in the country's natural environment. The practical guide is designed for landowners, developers,
15/04/2025
Award-winning principal contractor Procast Group has further expanded its presence across Scotland with the opening of a new base in Dumfries. The Hamilton-based firm has invested £30,000 in a new warehouse and office facility in the Maxwelltown Industrial Estate in Dumfries and Galloway, marking it
14/04/2025
Glasgow City Council's Affordable Housing Supply Programme (AHSP) facilitated the completion of over 1,000 new affordable homes in the city during the past year, despite facing budgetary reductions at the start of the financial year. The initial grant of £78.687 million from the Scottish Government
14/04/2025
A key phase of Scottish Water's £11.5 million project to upgrade a strategic rising sewer main connecting Renfrew and Glasgow is set to begin, resulting in a significant road closure. From Monday, 28 April 2025, Ferry Road in Renfrew will be closed to all vehicular traffic for a period of four mont
Morris & Spottiswood LtdRBT Underfloor LimitedDMC VisualsContainexHutton Stone Co LtdQuickFix Plumbing & HeatingScaffolding & Access Supplies LtdM L Contracts Scotland (Stone) LtdJJK RoofingHBB GeoSales Ltd