Network Rail has announced the completion of work to regrade a slope above the railway near Lockerbie to protect against adverse weather.
The work was at the first of 11 sites on the West Coast Mainline highlighted as vulnerable to adverse weather and delivered as part of a wider weather resilience project which will see an investment of £300,000.
To address this, 80 tonnes of spoil were removed from the embankment to create benches before it was lined and reconstructed with a more permeable material to enhance drainage and improve stability on the slope.
Stone had been delivered and stockpiled in advance and an excavator with a 13-metre reach was positioned on the crest of the slope to carry out the work while a 10-tonne tipper worked to transfer spoil and stone to support. A Road Rail Vehicle (RRV) also supported from track level to assist the work and to transport additional materials.
The work was completed overnight with no disruption for passenger and freight traffic.
Thomas Podger, Project Manager, commented: "Our asset teams have identified a number of locations where the slopes adjacent to the railway are showing early signs of being vulnerable to adverse weather. By packaging multiple sites together, we can proactively and efficiently reduce this risk.
"Careful planning and coordination of effort across our business is allowing us to improve the resilience of the network in the context of the changing climate.
"While each individual site is relatively small, work across all eleven locations
that have been earmarked for slope regrades will improve Scotland's Railway for passengers and freight customers."
Construction News
01/04/2022
Network Rail Completes Slope Regrade Works Near Lockerbie


16/04/2025
Construction work on the £5 million repair and refurbishment project at the Loch Centre in Tranent is scheduled to commence in June 2026.
East Lothian Council has announced the anticipated start date for the significant upgrade to the well-used community facility.
Under the current timetable, the

16/04/2025
A £636,000 project to install solar panels at the Gorbals water pumping station in South Ayrshire has been successfully completed.
The scheme aims to provide a renewable energy source for pumping water to thousands of customers in the region.
The project involved the installation of 793 solar pan

16/04/2025
A planning application has been lodged with Glasgow City Council by The JR Group, acting on behalf of Wheatley Group, for the construction of 29 much-needed affordable homes in the Baillieston area of the city.
The proposed development on Caledonia Road will offer a mix of one- and two-bedroom apa

16/04/2025
Residents in 20 blocks of flats across Coatbridge are already experiencing the positive impacts of a recently completed, ambitious energy efficiency refurbishment project.
The extensive construction work has delivered significant improvements to the properties, including the installation of cavity

16/04/2025
Ground investigation works are commencing this month at the proposed site for Orkney Islands Council’s Scapa Deep Water Quay at Deepdale in Holm.
These initial investigations will be followed by marine-based site investigation works scheduled to begin in June.
These works form part of the Pre-Con

16/04/2025
Construction work has been finalised on a significant new housing development in Motherwell town centre, delivering 42 newly built, highly energy-efficient flats alongside the respectful conversion of the B-Listed YMCA building into a further six homes. The project, part of North Lanarkshire Council

16/04/2025
The Construction Industry Training Board (CITB) has today released its year-end performance data for its New Entrant Support Team (NEST), revealing a significant increase in apprenticeship starts. During the financial year 2024-25, NEST supported 4,128 individuals in commencing apprenticeships, a su

16/04/2025
A water-powered mill in Angus is set to grind grain once again after receiving a record-breaking donation to fund its restoration.
The National Trust for Scotland has announced that a long-time member of the conservation charity has gifted an incredible £2.4 million, one of the largest single dona

15/04/2025
Construction of a £70 million student accommodation development at 292-298 St Vincent Street in Glasgow has reached a significant milestone, with the building now visibly rising from the ground.
Drone footage has captured the progress of the project, which is a partnership between developer Artisa

15/04/2025
Energy regulator Ofgem is expected to confirm today (April 15) its finalised Connections Reform process, designed to expedite grid connections for renewable energy projects that are ready and crucial for achieving the UK's clean power targets for 2030 and beyond.
The new connections system, anticip