Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 14,698 companies....

Construction News

23/03/2022

Multi-Facet Development Approved In Ellon

Construction News Image
Aberdeenshire Council has granted full planning permission for the development of a council office, public library and family centre at the former academy site at Schoolhill in Ellon.

The two-storey development seeks to create a 'civic hub' for the town, and forms part of the wider masterplan for the area.

The office section of the building is to feature a public entrance to the south, and would feature a ceremony room and registrar's office, along with a 'civic area' in front of the building.

The internal layout of the building has been designed to be easy to navigate for people of all physical abilities, and will feature a 'Changing Places' toilet facility that can be accessed from outside.

There will be a separate entrance to the east for the library and family resource centre, which will feature an outdoor play area.

A report before councillors stated: "The development seeks to create a 'civic hub', whereby it would be closely related to the town centre, and within the proximity of other public sector uses such as the police station and fire station.

"Furthermore, in concentrating the number of council uses into one location near to the centre of Ellon, it would seek to provide an economic benefit to local businesses by bringing people to the area."

A car park for 44 vehicles would sit to the west of the site, accessed from Union Street, with additional capacity to be accommodated within nearby car parks. Electric vehicle charging points will be provided and cycle lockers and stands will also be installed on the site, while indicative plans for a pedestrian crossing and traffic calming measures including a 'rumble strip' have also been detailed.
-- Advertisement --
NorthernAsbestosServicesLtd



A landscaping scheme will include planting to support pollinating insects. The construction of the building will also include 'swift bricks' and 'bat bricks' to allow for roosting.

The building aims to achieve 'net zero' operation standards and will feature a number of carbon reduction measures. The report before councillors noted the development would free up retail and office space in Ellon town centre as council services move to the new office.

A key area of focus has been the protection of a walnut tree thought to be around 130 years old, which sits on the eastern edge of the site. Protecting the tree means that the footway on Bridge Street will be narrower at that point than the recommended 2m, leading to an objection from the council's roads service.

The existing boundary wall by the tree is to be reduced in height, and additional traffic calming measures have been proposed on Union Street.

The application is a departure from the Local Development Plan and the proposals drew two objections, raising concerns over overshadowing, loss of light and privacy, parking provision and the layout and appearance of the development.

The committee heard from a nearby resident who, although supportive of the scheme in general, called for the location of the building to be adjusted to reduce the overshadowing of nearby homes and loss of privacy.

During discussion, councillors asked a number of questions of the planning service regarding the walnut tree and footpath widths, the possibility of 'pivoting' the building, and matters relating to energy efficiency and the 'green' credentials of the project.

The committee went on to approve the planning application without alteration, subject to various conditions, including connection of the development to the public water supply and public sewer.

Conditions also include agreeing the location of swift and bat bricks, agreement of lighting arrangements for the car park, and the development of an energy statement and construction traffic management plan.

The creation of a Changing Places toilet, a tree protection plan, and details of landscaping have also been conditioned, and the committee also asked for a flagpole to be incorporated into the plans.

Latest Construction News

17/04/2025
A joint venture between Sir Robert McAlpine Capital Ventures and Buccleuch Property has successfully acquired 101 Centre Street in Glasgow, signalling a significant investment in the city's burgeoning southbank area. The 50/50 partnership aims to unlock substantial redevelopment potential on the 1.7
17/04/2025
Biotech firm MiAlgae has taken a significant step in its expansion plans by submitting proposals for a new production facility in Grangemouth, Scotland. The move is set to bolster Scotland’s green economic transition, with the first phase of the site projected to generate over 100 green jobs once op
17/04/2025
Scottish Water has completed the initial phase of a significant peatland restoration project at Loch Katrine, a vital source of drinking water for over a million customers in Glasgow and the surrounding areas. The 400-hectare initiative aims to enhance water quality by reducing the amount of organ
17/04/2025
Clark Contracts has commenced work on a new £30 million purpose-built student accommodation (PBSA) development on Osborne Street in Glasgow. The contractor was appointed by Ambassador Group to undertake the design and build of the 273-bed project. Located in the heart of Glasgow City Centre withi
17/04/2025
Seven projects dedicated to promoting, celebrating, and enhancing Scotland's rich and diverse heritage are set to receive a share of £3.9 million in funding. The grants have been awarded through Historic Environment Scotland's (HES) Partnership Fund, which supports third-sector organisations making
17/04/2025
The Viking Community Fund has distributed over £1 million to 52 projects in the Shetland Islands since its inception on 1 September 2024. The funding has provided vital support to a diverse range of community initiatives, from small grants for youth clubs and sports teams to significant investment
17/04/2025
The Finishes & Interiors Sector (FIS) has announced a new partnership with The Skills Centre to provide essential training and support for individuals seeking careers in the finishes and interiors sector. The collaboration is a direct response to the increasing skills shortage within the constructio
17/04/2025
John Aitchison, Managing Director of Maxi Construction, has announced the successful acquisition of several new contracts. Commenting on the recent awards, Mr Aitchison stated: "These contracts represent repeat business and awards via some of the frameworks we’re appointed to. We look forward to suc
16/04/2025
Construction work on the £5 million repair and refurbishment project at the Loch Centre in Tranent is scheduled to commence in June 2026. East Lothian Council has announced the anticipated start date for the significant upgrade to the well-used community facility. Under the current timetable, the
16/04/2025
A £636,000 project to install solar panels at the Gorbals water pumping station in South Ayrshire has been successfully completed. The scheme aims to provide a renewable energy source for pumping water to thousands of customers in the region. The project involved the installation of 793 solar pan
This web site uses cookies to improve your experience and by viewing our content you accept their use. Click here to remove this notice.
RBT Underfloor LimitedMorris & Spottiswood LtdWestermans International LtdHugh Simpson (Contractors) LtdTennants (Elgin) LtdCF Concrete PumpingPAUL Heat RecoveryAtlas Winch & Hoist Services LtdClaymore Training LimitedMulberry Kitchen Design