A public consultation has been launched into four design options for a new active travel bridge crossing at Banff for pedestrians and cyclists.
Aberdeenshire Council previously commissioned a study to explore options for a new crossing at the River Deveron between Banff and Macduff.
The study by consultants AECOM has been funded and supported by Nestrans - the regional transport partnership for Aberdeen City and Aberdeenshire - building on previous work undertaken and reflecting the desire for greater resilience in the vital link between the two coastal towns.
Among the study's key aims is providing active and sustainable travel opportunities between Banff and Macduff, improving local accessibility and connectivity, helping to improve health and reduce emissions and enhancing a historic social connection between two communities
It will also improve the transport options available to those living and/or working in the two communities by encouraging a shift from car-based to active forms of transport by enabling walking and cycling as travel alternatives.
As part of the consultation exercise the community will be able to use an online forum to access information about the four proposals and provide views and feedback on the key issues and opportunities associated with a new active travel bridge.
The consultation runs until November 30 and offers four options:
• Option 1 is a cable-stayed bridge proposal to the north of the existing Banff Bridge and would be slightly curved at its central point towards the existing bridge. A single tower would support the structure.
• Option 2 is constructed of marine timber and is again located to the north of the existing Banff Bridge. This option would cross in a straight line. There are multiple supports with this option, and the initial intention is that these would align with the supports of the existing Banff Bridge.
• Option 3 is a downstream bridge constructed of concrete with arches similar to those of the existing Banff Bridge, though the design finish would be considerably different to that of the historic structure. This bridge is slightly further north than options 1 and 2 making for a longer bridge, but shorter overall journey for pedestrians and cyclists. This option will extend from the Coop on the western side of the river to the former car park on the eastern side.
• Option 4 is a concrete structure to the south of the existing bridge. This option has open arches, again acknowledging the design of the existing structure though aesthetically looking quite different.
Chair of Aberdeenshire Council's Environment and Infrastructure Services Committee and vice-chair of Nestrans, Cllr Peter Argyle, said: "I am delighted to see the four impressive design options being revealed for the first time and would strongly encourage the communities of Banff and Macduff to engage with us during the consultation period to ensure this active travel bridge is developed to meet the needs of everyone.
"The creation of a completely new crossing would provide a safe route for pedestrians and cyclists to enjoy healthy active travel between Banff and Macduff for years to come."
ISC vice-chair and Banff councillor, John Cox, added: "This study and the valuable feedback from the community consultation will enable Aberdeenshire Council to make a decision in respect of the location of this new connection between the two towns and help provide the basis for bids to external funding bodies to make it a reality.
"This is an opportunity to complement the work in establishing a complete link along the Banffshire Coast from Speyside through Moray to Buchan. Of course, the consultation should not be confused between the debate of a footbridge versus a new road bridge. The road bridge forms part of other considerations with regards to its condition and impact should it become unusable for vehicles."
Time and date
CONSTRUCTION DIRECTORY
Latest Construction News
26/11/2024
Scottish Water has unveiled its largest-ever procurement initiative, aiming to modernise the nation's water and wastewater infrastructure while safeguarding the environment. The program, named Delivery Vehicle 4, is valued between £5 billion and £9 billion and is set to run from 2027 to 2033, with ...
26/11/2024
The City of Edinburgh Council has granted planning permission, subject to conditions, for the refurbishment of Calton Square, an office building currently occupied by Baillie Gifford until the end of December 2025. Promoted by Ardstone Capital on behalf of Manova Partners, the project aims to ...
26/11/2024
First Minister John Swinney, MSP for Perthshire North, praised the progress being made on the construction of the new Perth High School during a visit on Friday, 22 November. He was joined by Jim Fairlie, MSP for Perthshire South and Kinross-shire, alongside senior Perth and Kinross Councillors, ...
26/11/2024
A state-of-the-art playpark has officially opened at King George V Park in Bearsden, following the completion of a £100,000 refurbishment. Funded by a combination of East Dunbartonshire Council (EDC) Capital Funding and the Scottish Government’s Renewing Scotland’s Play Parks initiative, the ...
26/11/2024
Fife Council has launched a public consultation, inviting residents, businesses, and organizations to contribute ideas and propose sites for inclusion in the next Local Development Plan, known as Fife's Place Plan. The council is calling on community councils, landowners, and developers to share ...
26/11/2024
The Chief Executive of East Lothian Council has announced she is to retire in February 2025. Monica Patterson who has been Chief Executive for almost five years, has spent most of her professional career working in local government. Prior to joining East Lothian Council in 2010, she was Head of ...
25/11/2024
West of Scotland Housing Association (WSHA) and Connect Modular have jointly submitted a planning application to Glasgow City Council for the development of 33 affordable homes in Cowlairs. This project aligns with the wider Cowlairs Park regeneration scheme and the city's ambitious housing ...
25/11/2024
Arc-Tech (Scotland) has successfully completed a £6m Mechanical and Electrical (M&E) services package for the Lost Shore Surf Resort in Edinburgh. The state-of-the-art resort, which opened its doors earlier this month, features a range of amenities, including a wave pool, luxury lodges, and ...
25/11/2024
Scottish Water has successfully completed the construction of a groundbreaking hydro energy generation scheme at Whiteadder Reservoir in East Lothian. This innovative project, believed to be the first of its kind in Europe, will harness the power of water to offset a significant portion of the ...
25/11/2024
Work is set to commence on a £6.5 million project to upgrade the Double Dykes Gypsy/Traveller site near Perth. The initiative aims to replace outdated chalets with modern, energy-efficient accommodation and implement significant site improvements. Perth & Kinross Council secured £3.9 million from ...