Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 14,696 companies....

Construction News

09/09/2021

Next Stage Of Stonehaven Flood Protection Scheme To Get Underway

Construction News Image
Aberdeenshire Council have announced that final carriageway surfacing works are to be carried out as part of the next stage of the Stonehaven Flood Protection Scheme.

The following works are to be carried out:

• Low Wood Road (green area on plan) at the junction with Carron Gardens. This area will be under traffic light control– 13th & 14th September.

• Carron Gardens from Woodview Court to Low Wood Road (pink area on plan) will be closed to all traffic. Alternative access will be via Invercarron Resource Centre – 15th September
-- Advertisement --
NorthernAsbestosServicesLtd



• Carron Terrace – from Green Bridge to the dead-end area will be closed (sand area on plan), including the junction with Arduthie Street. This means that vehicular access to Carron Terrace will not be possible from 7am on 16th September.

During this period a number of restrictions will also be in place as follows:

• No waiting on Carron Terrace – therefore please ensure vehicles are moved from 7am on 16th September

• Green Bridge will be closed 13 to 16 September with the diversion via Red Bridge

Please note that these dates may be impacted by outside factors such as weather or plant breakdowns, but we will do our utmost to keep the works on track. Once again, we would like to thank all residents impacted by the flood protection works for their patience and understanding.

Latest Construction News

16/04/2025
Construction work on the £5 million repair and refurbishment project at the Loch Centre in Tranent is scheduled to commence in June 2026. East Lothian Council has announced the anticipated start date for the significant upgrade to the well-used community facility. Under the current timetable, the
16/04/2025
A £636,000 project to install solar panels at the Gorbals water pumping station in South Ayrshire has been successfully completed. The scheme aims to provide a renewable energy source for pumping water to thousands of customers in the region. The project involved the installation of 793 solar pan
16/04/2025
A planning application has been lodged with Glasgow City Council by The JR Group, acting on behalf of Wheatley Group, for the construction of 29 much-needed affordable homes in the Baillieston area of the city. The proposed development on Caledonia Road will offer a mix of one- and two-bedroom apa
16/04/2025
Residents in 20 blocks of flats across Coatbridge are already experiencing the positive impacts of a recently completed, ambitious energy efficiency refurbishment project. The extensive construction work has delivered significant improvements to the properties, including the installation of cavity
16/04/2025
Ground investigation works are commencing this month at the proposed site for Orkney Islands Council’s Scapa Deep Water Quay at Deepdale in Holm. These initial investigations will be followed by marine-based site investigation works scheduled to begin in June. These works form part of the Pre-Con
16/04/2025
Construction work has been finalised on a significant new housing development in Motherwell town centre, delivering 42 newly built, highly energy-efficient flats alongside the respectful conversion of the B-Listed YMCA building into a further six homes. The project, part of North Lanarkshire Council
16/04/2025
The Construction Industry Training Board (CITB) has today released its year-end performance data for its New Entrant Support Team (NEST), revealing a significant increase in apprenticeship starts. During the financial year 2024-25, NEST supported 4,128 individuals in commencing apprenticeships, a su
16/04/2025
A water-powered mill in Angus is set to grind grain once again after receiving a record-breaking donation to fund its restoration. The National Trust for Scotland has announced that a long-time member of the conservation charity has gifted an incredible £2.4 million, one of the largest single dona
15/04/2025
Construction of a £70 million student accommodation development at 292-298 St Vincent Street in Glasgow has reached a significant milestone, with the building now visibly rising from the ground. Drone footage has captured the progress of the project, which is a partnership between developer Artisa
15/04/2025
Energy regulator Ofgem is expected to confirm today (April 15) its finalised Connections Reform process, designed to expedite grid connections for renewable energy projects that are ready and crucial for achieving the UK's clean power targets for 2030 and beyond. The new connections system, anticip
RBT Underfloor LimitedMorris & Spottiswood LtdSMS Alba Limited@rchitects Scotland LtdProlink Building Solutions LtdCross BlindsDiscount Kitchens and Bathrooms LtdHutton Stone Co LtdACCON UK LtdACCON UK Ltd