If you are a limited business registered in the UK carrying out civil engineering work, it is very likely that you are eligible for R&D Tax Credits.
R&D Tax Credits is a scheme set up to reward businesses for solving uncertainty & overcoming challenges in the workplace, which is something Engineers do every day.
R&D in Civil Engineering can be projects where you are working on new procedures and processes, adapting and implement new systems to tackle challenges.
Examples of claimable projects within Civil Engineering:
Infrastructure and Construction:
• Difficult ground conditions
• Drainage issues (implementation of new systems/designs, or overcoming challenges)
• Contaminated ground
• Sustainability (re-use of site earth to form permanent structures)
• Design calculations and testing
Renewable Energy:
• Logistical challenges (transportation of wind turbine components)
• Groundwork challenges that may impact laying the foundations
• Compatibility when upgrading/refurbishing energy network infrastructure
• Design calculations and testing
If you have carried out qualifying work, the scheme allows us to claim back some of the costs. This amount is calculated by figuring out how much time you have spent on your more challenging projects over your last two financial years.
Costs we can claim back on:
PAYE Salaries
Sub-Contracting Costs
Consumables
Materials
An R&D Tax Claim requires a technical report, this is the narrative that explains why a business is entitled to the relief.
To build a robust R&D Tax Claim, it is essential that the person writing it fully understands the technicalities of the business’s projects. This is why we hire Chartered Engineers to work alongside the Chartered Accountants to deliver for every single client. They understand the difficulties you face on-site and the complexities of your projects.
Find out if you are eligible for this relief by contacting our Comemercial Director on ben.henbest@harmoneyconsulting.co.uk
www.harmoneyconsulting.co.uk
Construction News
12/08/2021
Civil Engineering - Harmoney Consulting


15/04/2025
Construction of a £70 million student accommodation development at 292-298 St Vincent Street in Glasgow has reached a significant milestone, with the building now visibly rising from the ground.
Drone footage has captured the progress of the project, which is a partnership between developer Artisa

15/04/2025
Energy regulator Ofgem is expected to confirm today (April 15) its finalised Connections Reform process, designed to expedite grid connections for renewable energy projects that are ready and crucial for achieving the UK's clean power targets for 2030 and beyond.
The new connections system, anticip

15/04/2025
The ambitious transformation of Glasgow’s landmark George Square has moved into a tangible phase with the commencement of the erection of hoardings around the perimeter of the civic space. Starting today, the hoardings will enclose the Square for the duration of its 18-month redevelopment.
The pane

15/04/2025
Members of the public are invited to attend a consultation feedback event to discuss the proposed infrastructure associated with a new underground electricity transmission cable between the Kinardochy and Errochty substations in Perthshire.
The event will take place on Monday, 28 April, from 4 pm t

15/04/2025
Turner & Townsend have been appointed as project managers to develop a business case for the potential extension of the Borders Railway beyond its current terminus at Tweedbank to Hawick and Carlisle.
This key appointment will enable crucial work to progress on the project, including feasibility s

15/04/2025
Arran Community Renewables, a Community Benefit Society based on the Isle of Arran, has secured planning consent for a 6 MW solar farm. The Glenkiln Solar Farm, located approximately 1km west of Lamlash, is projected to generate 5,600MWh of clean renewable energy annually from 2027.
The £5 million

15/04/2025
A new Route Map has been published by the Scottish Land Commission (SLC) to ensure communities across Scotland secure tangible and long-lasting benefits from nature restoration projects and investment in the country's natural environment.
The practical guide is designed for landowners, developers,

15/04/2025
Award-winning principal contractor Procast Group has further expanded its presence across Scotland with the opening of a new base in Dumfries. The Hamilton-based firm has invested £30,000 in a new warehouse and office facility in the Maxwelltown Industrial Estate in Dumfries and Galloway, marking it

14/04/2025
Glasgow City Council's Affordable Housing Supply Programme (AHSP) facilitated the completion of over 1,000 new affordable homes in the city during the past year, despite facing budgetary reductions at the start of the financial year.
The initial grant of £78.687 million from the Scottish Government

14/04/2025
A key phase of Scottish Water's £11.5 million project to upgrade a strategic rising sewer main connecting Renfrew and Glasgow is set to begin, resulting in a significant road closure.
From Monday, 28 April 2025, Ferry Road in Renfrew will be closed to all vehicular traffic for a period of four mont