Glasgow City Council have developed an attractive woodland walkway that will reduce local flood risk and enhance community greenspace in the south-east of the city.
A key Glasgow City Region City Deal project, the recently completed walkway on the former Kings Park golf course site was formed through a programme of tree planting and the construction of new path networks that link Croftpark Avenue with Croftside Avenue, offering an attractive active travel route for locals and visitors.
As well as making greenspace improvements, contractor RJ McLeod and project supervisor/design consultant AECOM have also introduced sustainable drainage features to free up capacity in the sewer network in the Kings Park and Croftfoot areas.
Work delivered on this City Deal project includes interventions within the former Kings Park golf course to capture and re-direct surface water run-off into a new basin, using ditches and sections of the Spittal Burn that now flow on the surface. Excess rainwater can now be slowly released from the basin into an area of the burn which flows within a culvert beneath Croftpark Avenue.
Project contractors have also worked closely with Croftfoot Primary School to construct an outdoor amphitheatre (as shown below) that combines outdoor learning space with an emergency storm water storage facility. A brand new MUGA pitch was also built for the school, as well as the installation of new surface water drainage features.
Work in this part of the city has made significant progress, with contractors expecting to be off-site by the end of the year.
Construction News
30/11/2020
Woodland Walkway Development To Reduce Local Flood Risk


17/04/2025
A joint venture between Sir Robert McAlpine Capital Ventures and Buccleuch Property has successfully acquired 101 Centre Street in Glasgow, signalling a significant investment in the city's burgeoning southbank area. The 50/50 partnership aims to unlock substantial redevelopment potential on the 1.7

17/04/2025
Biotech firm MiAlgae has taken a significant step in its expansion plans by submitting proposals for a new production facility in Grangemouth, Scotland. The move is set to bolster Scotland’s green economic transition, with the first phase of the site projected to generate over 100 green jobs once op

17/04/2025
Scottish Water has completed the initial phase of a significant peatland restoration project at Loch Katrine, a vital source of drinking water for over a million customers in Glasgow and the surrounding areas.
The 400-hectare initiative aims to enhance water quality by reducing the amount of organ

17/04/2025
Clark Contracts has commenced work on a new £30 million purpose-built student accommodation (PBSA) development on Osborne Street in Glasgow.
The contractor was appointed by Ambassador Group to undertake the design and build of the 273-bed project.
Located in the heart of Glasgow City Centre withi

17/04/2025
Seven projects dedicated to promoting, celebrating, and enhancing Scotland's rich and diverse heritage are set to receive a share of £3.9 million in funding. The grants have been awarded through Historic Environment Scotland's (HES) Partnership Fund, which supports third-sector organisations making

17/04/2025
The Viking Community Fund has distributed over £1 million to 52 projects in the Shetland Islands since its inception on 1 September 2024.
The funding has provided vital support to a diverse range of community initiatives, from small grants for youth clubs and sports teams to significant investment

17/04/2025
The Finishes & Interiors Sector (FIS) has announced a new partnership with The Skills Centre to provide essential training and support for individuals seeking careers in the finishes and interiors sector. The collaboration is a direct response to the increasing skills shortage within the constructio

17/04/2025
John Aitchison, Managing Director of Maxi Construction, has announced the successful acquisition of several new contracts. Commenting on the recent awards, Mr Aitchison stated: "These contracts represent repeat business and awards via some of the frameworks we’re appointed to. We look forward to suc

16/04/2025
Construction work on the £5 million repair and refurbishment project at the Loch Centre in Tranent is scheduled to commence in June 2026.
East Lothian Council has announced the anticipated start date for the significant upgrade to the well-used community facility.
Under the current timetable, the

16/04/2025
A £636,000 project to install solar panels at the Gorbals water pumping station in South Ayrshire has been successfully completed.
The scheme aims to provide a renewable energy source for pumping water to thousands of customers in the region.
The project involved the installation of 793 solar pan