Build Scotland Construction Directory
Time and date
CONSTRUCTION DIRECTORY
Share this page
Construction News
11/11/2019

Revolutionary Wastewater Technology Trialled In Bo'ness

Construction News Image
The future of wastewater processing in the UK is set to be revolutionised with new technology.

A trial of Microvi's MNE™ technology took place at Scottish Water's Waste Water Development Centre at Bo'ness, delivering promising results.

Microvi, a green technology company based in California, in collaboration with Scottish Water carried out a six-month trial of the process at the centre near Falkirk.

During the trial the plant treated primary settled effluent taken from the Bo'ness Waste Water Treatment Works primary tanks which are situated right next to the test centre.

The main objective of the trial was to establish if Microvi's MNE technology can achieve treatment performance of total BOD (Biological Oxygen Demand) and TSS (total suspended solids) of minimum 20 mg/l and Ammonia of minimum 5 mgN/l, which is the typical effluent consent requirement.

It was also to test if the Microvi MNE can achieve much tighter standards and reduce the amount of ammonia in the final effluent – with a target of total BOD and TSS of 5 mg/l and Ammonia of 1 mgN/l.

The technology uses specially selected, naturally occurring bacteria which consume pollutants in waste water. It creates an optimum environment for these bacteria – known as biocatalysts - to make them work more efficiently. It is designed to intensify the population of the bacteria and speed up the rate these good bacteria out-compete the bad bacteria.

-- Advertisement --
NorthernAsbestosServicesLtd

The technology aims to drastically reduce the amount of sludge produced. This happens as a result of the biocatalyst creating an environment where bacteria reproduction is limited. Reducing sludge cuts the energy, transport and chemical requirements to manage bio-solids and in turn means far less space needed for the treatment process.

The results of the trial confirmed the Microvi MNE process can treat ammonia and soluble BOD to below levels of detection at high flow and high organic loading rates.

It showed that under normal operating conditions the effluent consistently achieves effluent ammonia concentration below 1 mg/l with an HRT (hydraulic retention time) of around 4 hours – around half the time of other comparable current technologies including conventional Activated Sludge Process.

It also found that high levels of ammonia removal can also be achieved even at 2.3 hours HRT at temperatures as low as 10C, a considerable reduction against existing processes. The trial also confirmed there was no net generation of sludge through the removal of ammonia and BOD with an average zero percentage change in sludge over the test period, which can lead to significant capital and operating cost benefits in the treatment and disposal of biosolids.

It confirmed Microvi's waste water technology has significant advantages over conventional water treatment processes. It requires a smaller footprint and does not generate biological solids, while removing BOD, ammonia, phosphorus and nitrate. The solution is easy to use and can be used in existing infrastructure.

Welcoming the results of the trial, George Ponton, Head of Research and Innovation at Scottish Water, said: "The trial has highlighted the potential this innovative technology has to meet BOD and ammonia standards in a smaller footprint than conventional activated sludge systems. It showed Microvi can be an effective technology for process intensification at wastewater treatment works, allowing us to enable growth using less energy and a lower carbon footprint.

"This technology, has the potential to be part of our future asset base, enabling sustainable growth and improving process efficiency at Scottish Water's treatment works."

The trial highlighted the opportunity to improve the particulate removal needed to meet total BOD and TSS standards. The improvement strategies include hybrid Activated Sludge and Microvi process, advanced primary or secondary treatment using chemicals.

These strategies will now be tested as part of an extended Microvi MNE trial with funding from the Water Test Network. This is an EU funded project, led by Scottish Water, which aims to support SMEs to develop, test and verify new innovation to the water industry.

Latest Construction News

22/11/2024

SP Energy Networks has announced a major investment in Britain's electricity grid, selecting 19 preferred partners to deliver a £5.4bn supply chain programme. This significant initiative aims to meet increasing energy demand and facilitate future growth. The selected companies, many of which are ...
22/11/2024

Edinburgh City Council has launched a 12-week public consultation on a new strategy to revitalise Princes Street and the wider Waverley Valley. The vision aims to create a more vibrant and welcoming city centre, attracting investment, supporting businesses, and enhancing the visitor ...
22/11/2024

Ener-G Services Limited, a leading UK electrical engineering company specialising in renewables, marine, and offshore sectors, has expanded its operations in Westhill, Aberdeenshire. The company has leased Unit 6E at Kingshill Commercial Park, a 2,500 sq ft space, on a 5-year lease. This new ...
22/11/2024

A consortium of leading scientists, industry experts, and academic institutions has joined forces to accelerate Scotland's offshore wind sector. The £2.5 million project, led by the University of Edinburgh in collaboration with the University of Dundee and the Forth and Tay Offshore cluster (FTO), ...
22/11/2024

The Port of Aberdeen and Turner & Townsend were highly commended in the 'Engineering, Construction & Infrastructure Project of the Year' category at the APM Project Management Awards 2024. The award recognises excellence in project management and the positive impact on end-users. The £420 million ...
22/11/2024

South Lanarkshire Council's £10 million fire safety improvement programme has reached a significant milestone, with CCG (Scotland) completing installations in over 1,700 high-rise residences across East Kilbride and Cambuslang. The Glasgow-based construction firm has been working closely with the ...
22/11/2024

SSEN Transmission, a key player in the UK's energy transition, is set to further expand its workforce and move into a new, sustainable office space in Glasgow. The company's commitment to net zero and the increasing demand for green energy workers has led to significant growth, with the number of ...
22/11/2024

Scottish Water is investing in the upgrade of its Loch Eck clean water plant in Dunoon. The project involves replacing outdated dry well pumps with new, more reliable pumps capable of operating in both wet and dry conditions. WGM Engineering, an RSK Group company, has been tasked with carrying out ...
22/11/2024

Scottish Land & Estates has expressed serious concerns over the Scottish Government's Land Reform Bill, particularly the provisions that would allow ministers to force landowners to sell large estates in lots. Sarah-Jane Laing, the organisation's chief executive, stated that while the land-based ...
22/11/2024

Clark Contracts employees have once again shown their commitment to community engagement by volunteering at Silverburn Park in Leven. On Thursday, 21st November, 16 members of the team spent their day planting over 400 trees and carrying out other landscaping tasks. This latest volunteering effort ...
RBT Underfloor LimitedMorris & Spottiswood LtdSEEIT3DCF Concrete PumpingMaccaferri LtdDiscount Kitchens and Bathrooms LtdShopfronts ScotlandJSJ Foam Insulation LtdEarth Tech LPS LTDSolway Ecology Consulting Ltd
Terms and Conditions
2024/11/23 09:14:24