Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 14,696 companies....

Construction News

15/01/2019

FP McCann Solutions Deployed In Edinburgh Housing Development

Construction News Image
FP McCann's precast concrete hollowcore and solid plank flooring solutions have been deployed in an ongoing housing development in Scotland.

The Northern-Ireland precast concrete supplier and manufacturer installed 3,000m² of its solutions in the 16-apartment building in Edinburgh.

The work was completed on behalf of main building contractor and structural steel frame installer, AMA Construction, by the company's Scotland-based fixing team.

An onsite tower crane was used to install the 200mm deep prestressed hollowcore and 100mm deep prestressed solid slab, with the solid slab being used to form the balconies to each apartment. A perimeter edge trim was fixed to the top of the structural steel beams, along with the progressive collapse tie details and concreting works to the top of the slab level.
-- Advertisement --
NorthernAsbestosServicesLtd



The hollowcore floor has been designed to accommodate a 3.0KN/m² imposed load, with some slab soffits left as an exposed concrete finish in the underground car parking area. The flooring was installed over a five week period and has a fire rating up to two hours.

Over 50 tonnes of FP McCann's precast concrete stairs, landings and plinths were also incorporated in the build.

Site manager Bill Armstrong said: "The precast, prestressed concrete hollowcore planks and reinforced solid composite flooring specified as part of the design and build were all supplied to the highest standard on a just-in-time delivery schedule. The FP McCann contracting team undertook the work in a safe and efficient manner, completing the installation to programme."

The four-storey building in Kinnear Road, North Edinburgh, which includes a lower level car park, was designed by architects Richard Murphy.

(CM/MH)

Latest Construction News

16/04/2025
Construction work on the £5 million repair and refurbishment project at the Loch Centre in Tranent is scheduled to commence in June 2026. East Lothian Council has announced the anticipated start date for the significant upgrade to the well-used community facility. Under the current timetable, the
16/04/2025
A £636,000 project to install solar panels at the Gorbals water pumping station in South Ayrshire has been successfully completed. The scheme aims to provide a renewable energy source for pumping water to thousands of customers in the region. The project involved the installation of 793 solar pan
16/04/2025
A planning application has been lodged with Glasgow City Council by The JR Group, acting on behalf of Wheatley Group, for the construction of 29 much-needed affordable homes in the Baillieston area of the city. The proposed development on Caledonia Road will offer a mix of one- and two-bedroom apa
16/04/2025
Residents in 20 blocks of flats across Coatbridge are already experiencing the positive impacts of a recently completed, ambitious energy efficiency refurbishment project. The extensive construction work has delivered significant improvements to the properties, including the installation of cavity
16/04/2025
Ground investigation works are commencing this month at the proposed site for Orkney Islands Council’s Scapa Deep Water Quay at Deepdale in Holm. These initial investigations will be followed by marine-based site investigation works scheduled to begin in June. These works form part of the Pre-Con
16/04/2025
Construction work has been finalised on a significant new housing development in Motherwell town centre, delivering 42 newly built, highly energy-efficient flats alongside the respectful conversion of the B-Listed YMCA building into a further six homes. The project, part of North Lanarkshire Council
16/04/2025
The Construction Industry Training Board (CITB) has today released its year-end performance data for its New Entrant Support Team (NEST), revealing a significant increase in apprenticeship starts. During the financial year 2024-25, NEST supported 4,128 individuals in commencing apprenticeships, a su
16/04/2025
A water-powered mill in Angus is set to grind grain once again after receiving a record-breaking donation to fund its restoration. The National Trust for Scotland has announced that a long-time member of the conservation charity has gifted an incredible £2.4 million, one of the largest single dona
15/04/2025
Construction of a £70 million student accommodation development at 292-298 St Vincent Street in Glasgow has reached a significant milestone, with the building now visibly rising from the ground. Drone footage has captured the progress of the project, which is a partnership between developer Artisa
15/04/2025
Energy regulator Ofgem is expected to confirm today (April 15) its finalised Connections Reform process, designed to expedite grid connections for renewable energy projects that are ready and crucial for achieving the UK's clean power targets for 2030 and beyond. The new connections system, anticip
RBT Underfloor LimitedMorris & Spottiswood LtdJRF Chimney Specialists and Heating DistributorsJGasMaccaferri LtdAlternative Tying Systems LtdACCON UK LtdRBT Underfloor LimitedJGasJohnston Oils Limited