Aberdeen City Council has launched an online exhibition to seek people's views into the proposed design for a 'missing' cycling link between the existing cycleway on Wellheads Drive and Dyce train station.
The new shared section would be encouraging people to use active travel – cycling, or walking – in the area and particularly to and from Dyce railway station, Aberdeen International Airport, Victoria Street in Dyce, and industrial and business premises in Wellheads Industrial Estate. It will also benefit people who take public transport to the City Council's new multi-million-pound TECA arena, conference and exhibition spaces when it opens next summer.
The new link will extend the existing shared cycleway along Wellheads Drive to link in with Farburn Terrace at the roundabout, and will create a shared cycleway around the roundabout, along Farburn Terrace (east) to Victoria Street and Farburn Terrace northwards towards the railway station.
The online exhibition and survey of the proposed design are available for people to view here and closes on 28 January, 2019.
Aberdeen City Council transportation spokesman Councillor Ross Grant said: "This is one of several cycling schemes which have been made public recently by Aberdeen City Council and I hope people who live or work in the Dyce area will take time out of a short part of their day to look and comment on the designs.
"I'd encourage as many people as possible to look at the proposed design and give feedback on it."
The design includes extending the existing 3m wide shared cycleway on Wellheads Drive northwards to the roundabout requiring the existing pavement to be upgraded and redetermined to a 3m wide shared cycleway.
It would also mean the roundabout is to be re-designed to create space for an off-carriageway peripheral 3.5m shared cycleway.
Another aspect of the design is the speed limit on Farburn Terrace (north) which would be reduced to 20mph, as it has a narrow carriageway and pavements which limits the opportunities to create a segregated cycling facility, however, low traffic volumes coupled with a new 20mph speed limit will provide a suitable route for cycling.
On Farburn Terrace (east), the existing pavement would be widened and made into a 3m wide shared cycleway to Victoria Street, with the exception underneath the railway bridge which wouldl be 1.8m.
Funding was secured by Aberdeen City Council from Sustrans and Nestrans to develop the detailed design for the shared cycleway. The section is part of the City's Active Travel Action Plan designed to improve cycling and walking facilities and routes.
The next stage of this project will be to finalise the detailed design, purchase land, promote a Redetermination Order, and secure funding for implementation.
Construction News
18/12/2018
Consultation Launched On Proposed 'Missing' Cycle Link


15/04/2025
Construction of a £70 million student accommodation development at 292-298 St Vincent Street in Glasgow has reached a significant milestone, with the building now visibly rising from the ground.
Drone footage has captured the progress of the project, which is a partnership between developer Artisa

15/04/2025
Energy regulator Ofgem is expected to confirm today (April 15) its finalised Connections Reform process, designed to expedite grid connections for renewable energy projects that are ready and crucial for achieving the UK's clean power targets for 2030 and beyond.
The new connections system, anticip

15/04/2025
The ambitious transformation of Glasgow’s landmark George Square has moved into a tangible phase with the commencement of the erection of hoardings around the perimeter of the civic space. Starting today, the hoardings will enclose the Square for the duration of its 18-month redevelopment.
The pane

15/04/2025
Members of the public are invited to attend a consultation feedback event to discuss the proposed infrastructure associated with a new underground electricity transmission cable between the Kinardochy and Errochty substations in Perthshire.
The event will take place on Monday, 28 April, from 4 pm t

15/04/2025
Turner & Townsend have been appointed as project managers to develop a business case for the potential extension of the Borders Railway beyond its current terminus at Tweedbank to Hawick and Carlisle.
This key appointment will enable crucial work to progress on the project, including feasibility s

15/04/2025
Arran Community Renewables, a Community Benefit Society based on the Isle of Arran, has secured planning consent for a 6 MW solar farm. The Glenkiln Solar Farm, located approximately 1km west of Lamlash, is projected to generate 5,600MWh of clean renewable energy annually from 2027.
The £5 million

15/04/2025
A new Route Map has been published by the Scottish Land Commission (SLC) to ensure communities across Scotland secure tangible and long-lasting benefits from nature restoration projects and investment in the country's natural environment.
The practical guide is designed for landowners, developers,

15/04/2025
Award-winning principal contractor Procast Group has further expanded its presence across Scotland with the opening of a new base in Dumfries. The Hamilton-based firm has invested £30,000 in a new warehouse and office facility in the Maxwelltown Industrial Estate in Dumfries and Galloway, marking it

14/04/2025
Glasgow City Council's Affordable Housing Supply Programme (AHSP) facilitated the completion of over 1,000 new affordable homes in the city during the past year, despite facing budgetary reductions at the start of the financial year.
The initial grant of £78.687 million from the Scottish Government

14/04/2025
A key phase of Scottish Water's £11.5 million project to upgrade a strategic rising sewer main connecting Renfrew and Glasgow is set to begin, resulting in a significant road closure.
From Monday, 28 April 2025, Ferry Road in Renfrew will be closed to all vehicular traffic for a period of four mont