Three sites in Aviemore are to be proposed as part of Cairngorms National Park's ongoing Local Development Plan (LDP).
An extension to tourism designations in Carr-Bridge and Grantown-on-Spey will also be considered under the new LDP.
Following the Main Issues Report (MIR) consultation that took place from November 2017 to February 2018, comments received suggested a number of additions that could be included in the next Plan. The Cairngorms National Park Authority (CNPA) must consult with members of the public and relevant organisations because they are newly proposed sites.
Planning Manager David Berry explained: "For the most part, the preferred options outlined in the MIR will be used as the basis for the Proposed Local Development Plan which we aim to publish for consultation in November. However, there are a limited number of new site allocations that we consider are appropriate to include in the next LDP and we would like feedback from the public as to whether they agree.
"There are three sites in Aviemore including a new community use allocation and two industrial areas. In Carr-Bridge an extension to the existing allocation for the Landmark Forest Park is being considered as is a small extension to the allocation at the Grantown Caravan Park.
"The consultation we are carrying out from this week to the 21 September concerns these site allocations only and no unrelated comments can be considered at this stage."
The Cairngorms National Park Authority (CNPA) is required to publish a LDP for the Park which must be reviewed every five years.
(CM/MH)
Construction News
14/08/2018
Three Sites Proposed For Cairngorms Local Development Plan


15/04/2025
Construction of a £70 million student accommodation development at 292-298 St Vincent Street in Glasgow has reached a significant milestone, with the building now visibly rising from the ground.
Drone footage has captured the progress of the project, which is a partnership between developer Artisa

15/04/2025
Energy regulator Ofgem is expected to confirm today (April 15) its finalised Connections Reform process, designed to expedite grid connections for renewable energy projects that are ready and crucial for achieving the UK's clean power targets for 2030 and beyond.
The new connections system, anticip

15/04/2025
The ambitious transformation of Glasgow’s landmark George Square has moved into a tangible phase with the commencement of the erection of hoardings around the perimeter of the civic space. Starting today, the hoardings will enclose the Square for the duration of its 18-month redevelopment.
The pane

15/04/2025
Members of the public are invited to attend a consultation feedback event to discuss the proposed infrastructure associated with a new underground electricity transmission cable between the Kinardochy and Errochty substations in Perthshire.
The event will take place on Monday, 28 April, from 4 pm t

15/04/2025
Turner & Townsend have been appointed as project managers to develop a business case for the potential extension of the Borders Railway beyond its current terminus at Tweedbank to Hawick and Carlisle.
This key appointment will enable crucial work to progress on the project, including feasibility s

15/04/2025
Arran Community Renewables, a Community Benefit Society based on the Isle of Arran, has secured planning consent for a 6 MW solar farm. The Glenkiln Solar Farm, located approximately 1km west of Lamlash, is projected to generate 5,600MWh of clean renewable energy annually from 2027.
The £5 million

15/04/2025
A new Route Map has been published by the Scottish Land Commission (SLC) to ensure communities across Scotland secure tangible and long-lasting benefits from nature restoration projects and investment in the country's natural environment.
The practical guide is designed for landowners, developers,

15/04/2025
Award-winning principal contractor Procast Group has further expanded its presence across Scotland with the opening of a new base in Dumfries. The Hamilton-based firm has invested £30,000 in a new warehouse and office facility in the Maxwelltown Industrial Estate in Dumfries and Galloway, marking it

14/04/2025
Glasgow City Council's Affordable Housing Supply Programme (AHSP) facilitated the completion of over 1,000 new affordable homes in the city during the past year, despite facing budgetary reductions at the start of the financial year.
The initial grant of £78.687 million from the Scottish Government

14/04/2025
A key phase of Scottish Water's £11.5 million project to upgrade a strategic rising sewer main connecting Renfrew and Glasgow is set to begin, resulting in a significant road closure.
From Monday, 28 April 2025, Ferry Road in Renfrew will be closed to all vehicular traffic for a period of four mont