Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 14,696 companies....

Construction News

17/10/2017

Window Panels To Be Removed From 11 High-Rise Blocks In Clydebank

Construction News Image
A number of high-rise blocks in Clydebank are to have their window panels replaced due to safety concerns.

Following the Grenfell Tower fire in June this year, an external expert was commissioned by the council to carry out a fire-safety assessment of the 22 blocks in the town.

The review recommended that the panels below each window in 11 of the blocks should be replaced after checks raised questions over the composition of the material used within the panels.

Despite the panels meeting current building safety regulations, to take out any uncertainty the local authority is removing panels from five blocks in Dalmuir, five blocks in North Drumry and one block at Kilbowie. Work is underway to identify alternative panels and the removal and replacement programme will begin as soon as possible.
-- Advertisement --
NorthernAsbestosServicesLtd



The independent assessor has stressed that the window panels "are not in any way similar to those installed in Grenfell" and has recommended the material is removed to ensure the buildings meet enhanced fire safety standards.

The reports' findings have also been shared with the Scottish Government and West Dunbartonshire Council is recommending that all Councils and Housing Associations with similar properties across Scotland consider independent assessment of the properties.

The council confirmed in June that none of the high-rise properties in West Dunbartonshire were clad with the external material used at Grenfell.

Peter Barry, West Dunbartonshire Council's Strategic Lead for Housing & Employability, said: "Our priority is the safety of our tenants and that is why we took the additional step of commissioning enhanced fire safety assessments. By carrying out these checks that are above and beyond what is expected, we have been able to identify an area for improvement in the form of the window panels.

"I want to be clear that the expert is explicit in saying these panels are not the same as the external wall coverings that were fitted at Grenfell. However, we will replace them as quickly as possible to fully reassure the people living in these homes."

(LM/MH)

Latest Construction News

16/04/2025
Construction work on the £5 million repair and refurbishment project at the Loch Centre in Tranent is scheduled to commence in June 2026. East Lothian Council has announced the anticipated start date for the significant upgrade to the well-used community facility. Under the current timetable, the
16/04/2025
A £636,000 project to install solar panels at the Gorbals water pumping station in South Ayrshire has been successfully completed. The scheme aims to provide a renewable energy source for pumping water to thousands of customers in the region. The project involved the installation of 793 solar pan
16/04/2025
A planning application has been lodged with Glasgow City Council by The JR Group, acting on behalf of Wheatley Group, for the construction of 29 much-needed affordable homes in the Baillieston area of the city. The proposed development on Caledonia Road will offer a mix of one- and two-bedroom apa
16/04/2025
Residents in 20 blocks of flats across Coatbridge are already experiencing the positive impacts of a recently completed, ambitious energy efficiency refurbishment project. The extensive construction work has delivered significant improvements to the properties, including the installation of cavity
16/04/2025
Ground investigation works are commencing this month at the proposed site for Orkney Islands Council’s Scapa Deep Water Quay at Deepdale in Holm. These initial investigations will be followed by marine-based site investigation works scheduled to begin in June. These works form part of the Pre-Con
16/04/2025
Construction work has been finalised on a significant new housing development in Motherwell town centre, delivering 42 newly built, highly energy-efficient flats alongside the respectful conversion of the B-Listed YMCA building into a further six homes. The project, part of North Lanarkshire Council
16/04/2025
The Construction Industry Training Board (CITB) has today released its year-end performance data for its New Entrant Support Team (NEST), revealing a significant increase in apprenticeship starts. During the financial year 2024-25, NEST supported 4,128 individuals in commencing apprenticeships, a su
16/04/2025
A water-powered mill in Angus is set to grind grain once again after receiving a record-breaking donation to fund its restoration. The National Trust for Scotland has announced that a long-time member of the conservation charity has gifted an incredible £2.4 million, one of the largest single dona
15/04/2025
Construction of a £70 million student accommodation development at 292-298 St Vincent Street in Glasgow has reached a significant milestone, with the building now visibly rising from the ground. Drone footage has captured the progress of the project, which is a partnership between developer Artisa
15/04/2025
Energy regulator Ofgem is expected to confirm today (April 15) its finalised Connections Reform process, designed to expedite grid connections for renewable energy projects that are ready and crucial for achieving the UK's clean power targets for 2030 and beyond. The new connections system, anticip
Morris & Spottiswood LtdRBT Underfloor LimitedEnvironmental Dust Solutions LtdMorris & Spottiswood LtdCharlie Cowie LTDBabbity EnvironmentalJRF Chimney Specialists and Heating DistributorsKattrak International LtdEco SIPs Homes LimitedRethync Ltd