Progress is continuing on a residential project in Glasgow.
CCG is building a new seven-storey structure containing 42 flats on Ellerslie Road in Yoker.
The project is being delivered for Sanctuary Scotland and will offer 'affordable' living to the organisation's tenants once completed in autumn 2017.
In addition, the scheme is set to become the tallest timber structure in Scotland thanks to the use of Cross Laminated Timber (CLT).
CLT is a form of structural timber that offers a sustainable alternative to steel and concrete, offering enhanced environmental efficiency standards and greater flexibility during the construction process.
CCG said it expects to begin installing the CLT superstructure in March, along with the exterior façade. As an extension of the 'Off-Site' process, the superstructure will be clad in a lightweight solution using acrylic brick slips, replicating a traditional brick aesthetic.
Alastair Wylie, Chairman and CEO of CCG, said: "This project is not only ground-breaking for CCG in terms of the CLT construction method but it also seeks to address some of the industry challenges in terms of resource demand; both the labour skills requirement and also the material supply chain.
"In doing so CCG are pushing the boundaries of our off-site manufacture capabilities and continue to show our success in striving to deliver the National target of building 50,000 new homes within the next 5 years as set by Scottish Government."
(LM/MH)
Construction News
16/02/2017
Work Continues On Glasgow Residential Project


15/04/2025
Construction of a £70 million student accommodation development at 292-298 St Vincent Street in Glasgow has reached a significant milestone, with the building now visibly rising from the ground.
Drone footage has captured the progress of the project, which is a partnership between developer Artisa

15/04/2025
Energy regulator Ofgem is expected to confirm today (April 15) its finalised Connections Reform process, designed to expedite grid connections for renewable energy projects that are ready and crucial for achieving the UK's clean power targets for 2030 and beyond.
The new connections system, anticip

15/04/2025
The ambitious transformation of Glasgow’s landmark George Square has moved into a tangible phase with the commencement of the erection of hoardings around the perimeter of the civic space. Starting today, the hoardings will enclose the Square for the duration of its 18-month redevelopment.
The pane

15/04/2025
Members of the public are invited to attend a consultation feedback event to discuss the proposed infrastructure associated with a new underground electricity transmission cable between the Kinardochy and Errochty substations in Perthshire.
The event will take place on Monday, 28 April, from 4 pm t

15/04/2025
Turner & Townsend have been appointed as project managers to develop a business case for the potential extension of the Borders Railway beyond its current terminus at Tweedbank to Hawick and Carlisle.
This key appointment will enable crucial work to progress on the project, including feasibility s

15/04/2025
Arran Community Renewables, a Community Benefit Society based on the Isle of Arran, has secured planning consent for a 6 MW solar farm. The Glenkiln Solar Farm, located approximately 1km west of Lamlash, is projected to generate 5,600MWh of clean renewable energy annually from 2027.
The £5 million

15/04/2025
A new Route Map has been published by the Scottish Land Commission (SLC) to ensure communities across Scotland secure tangible and long-lasting benefits from nature restoration projects and investment in the country's natural environment.
The practical guide is designed for landowners, developers,

15/04/2025
Award-winning principal contractor Procast Group has further expanded its presence across Scotland with the opening of a new base in Dumfries. The Hamilton-based firm has invested £30,000 in a new warehouse and office facility in the Maxwelltown Industrial Estate in Dumfries and Galloway, marking it

14/04/2025
Glasgow City Council's Affordable Housing Supply Programme (AHSP) facilitated the completion of over 1,000 new affordable homes in the city during the past year, despite facing budgetary reductions at the start of the financial year.
The initial grant of £78.687 million from the Scottish Government

14/04/2025
A key phase of Scottish Water's £11.5 million project to upgrade a strategic rising sewer main connecting Renfrew and Glasgow is set to begin, resulting in a significant road closure.
From Monday, 28 April 2025, Ferry Road in Renfrew will be closed to all vehicular traffic for a period of four mont