Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 14,699 companies....

Construction News

15/09/2016

CR Contracting Wins £15,000 Deal

Construction News Image
CR Contracting has won a £15,000 contract to carry out repair work around the River Dee in Aberdeenshire.

The contractor will repair damage to the riverside in Ballater caused by Storm Frank during winter last year.

Around 40 metres of damaged bund along the riverside will be reinstate, while armour stone will be placed at the toe of the embankment. Earthworks will be done to reinstate the embankment to its existing profile and erosion control material installed.
-- Advertisement --
NorthernAsbestosServicesLtd



In addition, existing one-tonne sandbags will be removed on Salisbury Road.

Work is expected to begin on 21 September, with riverside works finished by 17 October. Project completion is scheduled for 07 November.

Chair of the Marr Area Committee, Moira Ingleby, said: "This will continue the work to restore Ballater to its former glory which both the council and the community have been involved in since the terrible events at the turn of the year.

"Although it won't ensure the town is never flooded by another exceptional weather event, it does restore and build on the protection which was there previously."

(LM/MH)

Latest Construction News

15/04/2025
Construction of a £70 million student accommodation development at 292-298 St Vincent Street in Glasgow has reached a significant milestone, with the building now visibly rising from the ground. Drone footage has captured the progress of the project, which is a partnership between developer Artisa
15/04/2025
Energy regulator Ofgem is expected to confirm today (April 15) its finalised Connections Reform process, designed to expedite grid connections for renewable energy projects that are ready and crucial for achieving the UK's clean power targets for 2030 and beyond. The new connections system, anticip
15/04/2025
The ambitious transformation of Glasgow’s landmark George Square has moved into a tangible phase with the commencement of the erection of hoardings around the perimeter of the civic space. Starting today, the hoardings will enclose the Square for the duration of its 18-month redevelopment. The pane
15/04/2025
Members of the public are invited to attend a consultation feedback event to discuss the proposed infrastructure associated with a new underground electricity transmission cable between the Kinardochy and Errochty substations in Perthshire. The event will take place on Monday, 28 April, from 4 pm t
15/04/2025
Turner & Townsend have been appointed as project managers to develop a business case for the potential extension of the Borders Railway beyond its current terminus at Tweedbank to Hawick and Carlisle. This key appointment will enable crucial work to progress on the project, including feasibility s
15/04/2025
Arran Community Renewables, a Community Benefit Society based on the Isle of Arran, has secured planning consent for a 6 MW solar farm. The Glenkiln Solar Farm, located approximately 1km west of Lamlash, is projected to generate 5,600MWh of clean renewable energy annually from 2027. The £5 million
15/04/2025
A new Route Map has been published by the Scottish Land Commission (SLC) to ensure communities across Scotland secure tangible and long-lasting benefits from nature restoration projects and investment in the country's natural environment. The practical guide is designed for landowners, developers,
15/04/2025
Award-winning principal contractor Procast Group has further expanded its presence across Scotland with the opening of a new base in Dumfries. The Hamilton-based firm has invested £30,000 in a new warehouse and office facility in the Maxwelltown Industrial Estate in Dumfries and Galloway, marking it
14/04/2025
Glasgow City Council's Affordable Housing Supply Programme (AHSP) facilitated the completion of over 1,000 new affordable homes in the city during the past year, despite facing budgetary reductions at the start of the financial year. The initial grant of £78.687 million from the Scottish Government
14/04/2025
A key phase of Scottish Water's £11.5 million project to upgrade a strategic rising sewer main connecting Renfrew and Glasgow is set to begin, resulting in a significant road closure. From Monday, 28 April 2025, Ferry Road in Renfrew will be closed to all vehicular traffic for a period of four mont
Morris & Spottiswood LtdRBT Underfloor LimitedCommercial Transmissions GroupWestermans International LtdHugh Simpson (Contractors) LtdTennants (Elgin) LtdCF Concrete PumpingPAUL Heat RecoveryAtlas Winch & Hoist Services LtdClaymore Training Limited