Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 14,699 companies....

Construction News

20/08/2015

New MUGA's Ready For Primary Schools

A £600,000 programme to install new multi-use games areas (MUGA's) at primary schools is nearing completion in Inverclyde.

Work began on January on a £330,000 project to replace the blaes pitch at St Ninian's Primary School in Gourock.

Measuring 54 metres by 36 metres, the new surface is suitable for football, netball, basketball and general play.

In addition, the council has invested approximately £300,000 in smaller MUGA's, 15.6 metres by 10.8 metres, at six other primary schools in the area.
-- Advertisement --
NorthernAsbestosServicesLtd



They are Inverkip Primary, St Joseph's Primary, King's Oak Primary, St Francis' Primary, St Mary's Primary and St Michael's Primary.

Ardgowan Primary School has also undergone a £5.9m refurbishment, which incorporates a new 135 sq m MUGA complete with raised social space, seating and covered canopy structure.

Pupils at St John's Primary in Port Glasgow will benefit from a new MUGA as part of the £2.8m refurbishment project, which is nearing completion.

The £4.27m refurbishment of Kilmacolm Primary also includes a new MUGA to replace the existing blaes pitch which should be completed by the autumn next year.

Councillor Terry Loughran said: "We originally allocated over a million pounds for the MUGA programme but have been able to deliver it £400,000 under budget.

"That is great news and has allowed us to look at upgrading the two grass pitches at Moorfoot and Gourock primary schools."

(LM/MH)

Latest Construction News

15/04/2025
Construction of a £70 million student accommodation development at 292-298 St Vincent Street in Glasgow has reached a significant milestone, with the building now visibly rising from the ground. Drone footage has captured the progress of the project, which is a partnership between developer Artisa
15/04/2025
Energy regulator Ofgem is expected to confirm today (April 15) its finalised Connections Reform process, designed to expedite grid connections for renewable energy projects that are ready and crucial for achieving the UK's clean power targets for 2030 and beyond. The new connections system, anticip
15/04/2025
The ambitious transformation of Glasgow’s landmark George Square has moved into a tangible phase with the commencement of the erection of hoardings around the perimeter of the civic space. Starting today, the hoardings will enclose the Square for the duration of its 18-month redevelopment. The pane
15/04/2025
Members of the public are invited to attend a consultation feedback event to discuss the proposed infrastructure associated with a new underground electricity transmission cable between the Kinardochy and Errochty substations in Perthshire. The event will take place on Monday, 28 April, from 4 pm t
15/04/2025
Turner & Townsend have been appointed as project managers to develop a business case for the potential extension of the Borders Railway beyond its current terminus at Tweedbank to Hawick and Carlisle. This key appointment will enable crucial work to progress on the project, including feasibility s
15/04/2025
Arran Community Renewables, a Community Benefit Society based on the Isle of Arran, has secured planning consent for a 6 MW solar farm. The Glenkiln Solar Farm, located approximately 1km west of Lamlash, is projected to generate 5,600MWh of clean renewable energy annually from 2027. The £5 million
15/04/2025
A new Route Map has been published by the Scottish Land Commission (SLC) to ensure communities across Scotland secure tangible and long-lasting benefits from nature restoration projects and investment in the country's natural environment. The practical guide is designed for landowners, developers,
15/04/2025
Award-winning principal contractor Procast Group has further expanded its presence across Scotland with the opening of a new base in Dumfries. The Hamilton-based firm has invested £30,000 in a new warehouse and office facility in the Maxwelltown Industrial Estate in Dumfries and Galloway, marking it
14/04/2025
Glasgow City Council's Affordable Housing Supply Programme (AHSP) facilitated the completion of over 1,000 new affordable homes in the city during the past year, despite facing budgetary reductions at the start of the financial year. The initial grant of £78.687 million from the Scottish Government
14/04/2025
A key phase of Scottish Water's £11.5 million project to upgrade a strategic rising sewer main connecting Renfrew and Glasgow is set to begin, resulting in a significant road closure. From Monday, 28 April 2025, Ferry Road in Renfrew will be closed to all vehicular traffic for a period of four mont
Morris & Spottiswood LtdRBT Underfloor LimitedMaccaferri LtdAlternative Tying Systems LtdACCON UK LtdRBT Underfloor LimitedJGasJohnston Oils LimitedThe Big Block Co LtdEuro-Fab (Scotland)