Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 14,699 companies....

Construction News

17/12/2014

Engineering Firm Fined For Safety Failings

An engineering firm in Aberdeen has been fined for safety failings after an apprentice was injured by a pressurised hose.

The teenager, who was 16 at the time, was working for Alfred Cheyne Engineering Ltd, trading as ACE Winches, at its Turriff premises when the incident occurred on 25 July 2012.

Banff Sheriff Court heard the company was pressure-testing a hose when the apprentice was struck in the back and fell to the ground. He was taken to hospital with cuts and bruises, but made a full recovery.

A subsequent investigation by the Health and Safety Executive (HSE) said the incident had been caused when a section of the hose broke free from its coupling as it had not been tightened enough.
-- Advertisement --
NorthernAsbestosServicesLtd



There had also been similar failures in the past, but the court was told that testing procedures had not been changed. In addition, the company had also failed to provide formal training to staff carrying out the testing.

Niall Miller, HSE Principal Inspector, said: "This incident could have easily been avoided if Alfred Cheyne Engineering Ltd had carried out a risk assessment for the pressure testing of hose assemblies, which would have identified the safety measures required to reduce any risks.

"The need for pressure testing to be segregated from other work and for employees not to be allowed to approach any equipment while it is under pressure is well documented in guidance, which is readily available.

"In this case the young apprentice was lucky to receive only cuts and bruises, his injuries could have been a lot worse."

Alfred Cheyne Engineering Ltd deals in equipment for the offshore oil and gas, marine and renewable energy industries. The company was fined £10,000 after pleading guilty to breaching Section 2 of the Health and Safety at Work etc Act 1974.

(JP/CD)

Latest Construction News

15/04/2025
Construction of a £70 million student accommodation development at 292-298 St Vincent Street in Glasgow has reached a significant milestone, with the building now visibly rising from the ground. Drone footage has captured the progress of the project, which is a partnership between developer Artisa
15/04/2025
Energy regulator Ofgem is expected to confirm today (April 15) its finalised Connections Reform process, designed to expedite grid connections for renewable energy projects that are ready and crucial for achieving the UK's clean power targets for 2030 and beyond. The new connections system, anticip
15/04/2025
The ambitious transformation of Glasgow’s landmark George Square has moved into a tangible phase with the commencement of the erection of hoardings around the perimeter of the civic space. Starting today, the hoardings will enclose the Square for the duration of its 18-month redevelopment. The pane
15/04/2025
Members of the public are invited to attend a consultation feedback event to discuss the proposed infrastructure associated with a new underground electricity transmission cable between the Kinardochy and Errochty substations in Perthshire. The event will take place on Monday, 28 April, from 4 pm t
15/04/2025
Turner & Townsend have been appointed as project managers to develop a business case for the potential extension of the Borders Railway beyond its current terminus at Tweedbank to Hawick and Carlisle. This key appointment will enable crucial work to progress on the project, including feasibility s
15/04/2025
Arran Community Renewables, a Community Benefit Society based on the Isle of Arran, has secured planning consent for a 6 MW solar farm. The Glenkiln Solar Farm, located approximately 1km west of Lamlash, is projected to generate 5,600MWh of clean renewable energy annually from 2027. The £5 million
15/04/2025
A new Route Map has been published by the Scottish Land Commission (SLC) to ensure communities across Scotland secure tangible and long-lasting benefits from nature restoration projects and investment in the country's natural environment. The practical guide is designed for landowners, developers,
15/04/2025
Award-winning principal contractor Procast Group has further expanded its presence across Scotland with the opening of a new base in Dumfries. The Hamilton-based firm has invested £30,000 in a new warehouse and office facility in the Maxwelltown Industrial Estate in Dumfries and Galloway, marking it
14/04/2025
Glasgow City Council's Affordable Housing Supply Programme (AHSP) facilitated the completion of over 1,000 new affordable homes in the city during the past year, despite facing budgetary reductions at the start of the financial year. The initial grant of £78.687 million from the Scottish Government
14/04/2025
A key phase of Scottish Water's £11.5 million project to upgrade a strategic rising sewer main connecting Renfrew and Glasgow is set to begin, resulting in a significant road closure. From Monday, 28 April 2025, Ferry Road in Renfrew will be closed to all vehicular traffic for a period of four mont
Morris & Spottiswood LtdRBT Underfloor LimitedDMC VisualsContainexHutton Stone Co LtdQuickFix Plumbing & HeatingScaffolding & Access Supplies LtdM L Contracts Scotland (Stone) LtdJJK RoofingHBB GeoSales Ltd