Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 14,696 companies....

Construction News

08/03/2013

Solar Panels Installed At Kilncraigs

Construction News Image
Solar panels have been installed on the roof of Kilncraigs as part of Clackmannanshire Council's major redevelopment of the building.

It is due to become the Council headquarters later this year when both Greenfield House and Lime Tree House close, with staff moving to the redeveloped building.

This week Councillor Donald Balsillie, Convenor of the Enterprise and Environment Committee, inspected the new energy saving panels on the roof of the building which will become the Council headquarters in the autumn.
-- Advertisement --
NorthernAsbestosServicesLtd



He was joined on the roof top by Marshall Construction site manager Colin Paterson, who explained to the Convenor the full effect the panels will have on the building.

Councillor Balsillie said: "Architects, as part of the major redevelopment of the Kilncraigs campus realised that the south-facing traditional saw-tooth roof of the former mill building was ideal for the installation of the panels.

"These panels generate electricity from sunlight and will contribute to the electricity used in the building by IT equipment in particular."

The array of panels will generate 23 kW of electricity at peak output - enough power to power 100 desk top computers.

The new panels are connected to the building electricity installation and will offset electricity used from the grid. Almost all of the electricity generated will be used in the Kilncraigs building.

(CD)

Latest Construction News

16/04/2025
Construction work on the £5 million repair and refurbishment project at the Loch Centre in Tranent is scheduled to commence in June 2026. East Lothian Council has announced the anticipated start date for the significant upgrade to the well-used community facility. Under the current timetable, the
16/04/2025
A £636,000 project to install solar panels at the Gorbals water pumping station in South Ayrshire has been successfully completed. The scheme aims to provide a renewable energy source for pumping water to thousands of customers in the region. The project involved the installation of 793 solar pan
16/04/2025
A planning application has been lodged with Glasgow City Council by The JR Group, acting on behalf of Wheatley Group, for the construction of 29 much-needed affordable homes in the Baillieston area of the city. The proposed development on Caledonia Road will offer a mix of one- and two-bedroom apa
16/04/2025
Residents in 20 blocks of flats across Coatbridge are already experiencing the positive impacts of a recently completed, ambitious energy efficiency refurbishment project. The extensive construction work has delivered significant improvements to the properties, including the installation of cavity
16/04/2025
Ground investigation works are commencing this month at the proposed site for Orkney Islands Council’s Scapa Deep Water Quay at Deepdale in Holm. These initial investigations will be followed by marine-based site investigation works scheduled to begin in June. These works form part of the Pre-Con
16/04/2025
Construction work has been finalised on a significant new housing development in Motherwell town centre, delivering 42 newly built, highly energy-efficient flats alongside the respectful conversion of the B-Listed YMCA building into a further six homes. The project, part of North Lanarkshire Council
16/04/2025
The Construction Industry Training Board (CITB) has today released its year-end performance data for its New Entrant Support Team (NEST), revealing a significant increase in apprenticeship starts. During the financial year 2024-25, NEST supported 4,128 individuals in commencing apprenticeships, a su
16/04/2025
A water-powered mill in Angus is set to grind grain once again after receiving a record-breaking donation to fund its restoration. The National Trust for Scotland has announced that a long-time member of the conservation charity has gifted an incredible £2.4 million, one of the largest single dona
15/04/2025
Construction of a £70 million student accommodation development at 292-298 St Vincent Street in Glasgow has reached a significant milestone, with the building now visibly rising from the ground. Drone footage has captured the progress of the project, which is a partnership between developer Artisa
15/04/2025
Energy regulator Ofgem is expected to confirm today (April 15) its finalised Connections Reform process, designed to expedite grid connections for renewable energy projects that are ready and crucial for achieving the UK's clean power targets for 2030 and beyond. The new connections system, anticip
Morris & Spottiswood LtdRBT Underfloor LimitedDMC VisualsContainexHutton Stone Co LtdQuickFix Plumbing & HeatingScaffolding & Access Supplies LtdM L Contracts Scotland (Stone) LtdJJK RoofingHBB GeoSales Ltd