Dounreay Site Restoration Ltd has awarded GRAHAM Construction a £4.3 million contract to design and build a plant for the disposal of low-level radioactive waste from the clean-up and demolition of the site.
GRAHAM Construction will design and build a plant to encapsulate waste in grout inside containers before the containers are placed in a series of underground disposal vaults currently under construction.
“Workers who are dismantling the site collect much of the low-level radioactive waste in drums,” explained Stewart Henderson, project manager at DSRL.
“The drums are checked, compacted and the ‘pucks’ stacked inside metal containers. These containers are stored on the site at present. In 2014 we intend to begin emplacing the containers in the ground in a series of vaults now under construction.
“This plant will grout up the inside of each container to fill the void spaces between the pucks before the container is moved into the vault.
“As the vault fills up, we’ll grout the spaces in between each container as well, before the whole area is covered in concrete.
“It’s all about getting the waste into a condition that is safe for future generations and this plant is a key part of that.”
Items small enough to be drummed will fill an estimated 7000 containers, each weighing some 40 tonnes after grouting. Currently, the site has 750 containers in store ready for grouting and disposal.
Work on the design of the plant gets underway this week and construction is due to begin next summer. It is expected to take five months to complete.
The contract – issued on behalf of the Nuclear Decommissioning Authority - was tendered through the Official Journal of the European Union.
GRAHAM Construction is also the main contractor for the construction of the first two disposal vaults.
GRAHAM has maximised the use of local labour, equipment and materials since commencing work on the project last year and is seeking to utilise the skills and experience of local companies wherever possible on the latest contract.
Leo Martin, Director at GRAHAM said: “This latest contract award is a real endorsement of the work GRAHAM has already undertaken on the site at Dounreay.
“We are already making significant progress on the construction of the two sub-surface vaults for the disposal of solid low-level radioactive waste from the site clean-up.
“The restoration of Dounreay is a massive undertaking and the work we have undertaken gives us a tremendous platform for attracting further work in the nuclear industry both in Scotland and across the UK.”
The disposal of waste from the site’s decommissioning is expected to begin in 2014 and will continue until the site has been cleared by 2022-25.
It’s estimated the clean-up and demolition of the site will generate up to 175,000 cubic metres of low-level radioactive waste.
The site has planning permission for up to six underground vaults but is working to reduce the number needed through a vigorous waste minimisation programme.
(GK)
Time and date
CONSTRUCTION DIRECTORY
Latest Construction News
26/11/2024
Scottish Water has unveiled its largest-ever procurement initiative, aiming to modernise the nation's water and wastewater infrastructure while safeguarding the environment. The program, named Delivery Vehicle 4, is valued between £5 billion and £9 billion and is set to run from 2027 to 2033, with ...
26/11/2024
The City of Edinburgh Council has granted planning permission, subject to conditions, for the refurbishment of Calton Square, an office building currently occupied by Baillie Gifford until the end of December 2025. Promoted by Ardstone Capital on behalf of Manova Partners, the project aims to ...
26/11/2024
First Minister John Swinney, MSP for Perthshire North, praised the progress being made on the construction of the new Perth High School during a visit on Friday, 22 November. He was joined by Jim Fairlie, MSP for Perthshire South and Kinross-shire, alongside senior Perth and Kinross Councillors, ...
26/11/2024
A state-of-the-art playpark has officially opened at King George V Park in Bearsden, following the completion of a £100,000 refurbishment. Funded by a combination of East Dunbartonshire Council (EDC) Capital Funding and the Scottish Government’s Renewing Scotland’s Play Parks initiative, the ...
26/11/2024
Fife Council has launched a public consultation, inviting residents, businesses, and organizations to contribute ideas and propose sites for inclusion in the next Local Development Plan, known as Fife's Place Plan. The council is calling on community councils, landowners, and developers to share ...
26/11/2024
The Chief Executive of East Lothian Council has announced she is to retire in February 2025. Monica Patterson who has been Chief Executive for almost five years, has spent most of her professional career working in local government. Prior to joining East Lothian Council in 2010, she was Head of ...
25/11/2024
West of Scotland Housing Association (WSHA) and Connect Modular have jointly submitted a planning application to Glasgow City Council for the development of 33 affordable homes in Cowlairs. This project aligns with the wider Cowlairs Park regeneration scheme and the city's ambitious housing ...
25/11/2024
Arc-Tech (Scotland) has successfully completed a £6m Mechanical and Electrical (M&E) services package for the Lost Shore Surf Resort in Edinburgh. The state-of-the-art resort, which opened its doors earlier this month, features a range of amenities, including a wave pool, luxury lodges, and ...
25/11/2024
Scottish Water has successfully completed the construction of a groundbreaking hydro energy generation scheme at Whiteadder Reservoir in East Lothian. This innovative project, believed to be the first of its kind in Europe, will harness the power of water to offset a significant portion of the ...
25/11/2024
Work is set to commence on a £6.5 million project to upgrade the Double Dykes Gypsy/Traveller site near Perth. The initiative aims to replace outdated chalets with modern, energy-efficient accommodation and implement significant site improvements. Perth & Kinross Council secured £3.9 million from ...