A £3 million town centre improvement project has started in Wishaw.
The streetscape project along Main Street, will create a more attractive place for shoppers, residents, local businesses and visitors.
The creation of a more pedestrian friendly town centre is one of the key aims of the improvement scheme by creating an environment with:
• Less and slower traffic
• More efficient public transport
• Wider footways and quality street furniture, including new seating and lighting.
The council shall be using high quality materials such as sandstone, granite and stainless steel in order to provide a contemporary look and feel to the Main Street whilst also complimenting the original visual features of the area.
Although the road will be reduced in width to two lanes, traffic will still be able to move in both directions along Main Street. The works will also include changes to the shape of the existing road and pedestrian footpaths, this is to remove the level changes and barriers that currently exist today.
In completing the new Kitchener Street road link, traffic now has a route through the town centre that avoids the Main Street. In addition, car parks have been improved and back court areas transformed to offer additional parking and rear serving areas. Combined, this will make Main Street a more relaxed and less congested shopping area for pedestrians.
(GK)
Construction News
24/04/2012
Wishaw Town Centre Improvement Project underway

16/04/2025
Construction work on the £5 million repair and refurbishment project at the Loch Centre in Tranent is scheduled to commence in June 2026.
East Lothian Council has announced the anticipated start date for the significant upgrade to the well-used community facility.
Under the current timetable, the

16/04/2025
A £636,000 project to install solar panels at the Gorbals water pumping station in South Ayrshire has been successfully completed.
The scheme aims to provide a renewable energy source for pumping water to thousands of customers in the region.
The project involved the installation of 793 solar pan

16/04/2025
A planning application has been lodged with Glasgow City Council by The JR Group, acting on behalf of Wheatley Group, for the construction of 29 much-needed affordable homes in the Baillieston area of the city.
The proposed development on Caledonia Road will offer a mix of one- and two-bedroom apa

16/04/2025
Residents in 20 blocks of flats across Coatbridge are already experiencing the positive impacts of a recently completed, ambitious energy efficiency refurbishment project.
The extensive construction work has delivered significant improvements to the properties, including the installation of cavity

16/04/2025
Ground investigation works are commencing this month at the proposed site for Orkney Islands Council’s Scapa Deep Water Quay at Deepdale in Holm.
These initial investigations will be followed by marine-based site investigation works scheduled to begin in June.
These works form part of the Pre-Con

16/04/2025
Construction work has been finalised on a significant new housing development in Motherwell town centre, delivering 42 newly built, highly energy-efficient flats alongside the respectful conversion of the B-Listed YMCA building into a further six homes. The project, part of North Lanarkshire Council

16/04/2025
The Construction Industry Training Board (CITB) has today released its year-end performance data for its New Entrant Support Team (NEST), revealing a significant increase in apprenticeship starts. During the financial year 2024-25, NEST supported 4,128 individuals in commencing apprenticeships, a su

16/04/2025
A water-powered mill in Angus is set to grind grain once again after receiving a record-breaking donation to fund its restoration.
The National Trust for Scotland has announced that a long-time member of the conservation charity has gifted an incredible £2.4 million, one of the largest single dona

15/04/2025
Construction of a £70 million student accommodation development at 292-298 St Vincent Street in Glasgow has reached a significant milestone, with the building now visibly rising from the ground.
Drone footage has captured the progress of the project, which is a partnership between developer Artisa

15/04/2025
Energy regulator Ofgem is expected to confirm today (April 15) its finalised Connections Reform process, designed to expedite grid connections for renewable energy projects that are ready and crucial for achieving the UK's clean power targets for 2030 and beyond.
The new connections system, anticip