The latest state-of-the-art care home commissioned by the City of Edinburgh Council has officially opened its doors.
Inch View Care Home on Gilmerton Road has been built on the site of the former Kings Inch school.
It is the fourth new care home to be commissioned by the Council since 2007. The residents, who came from the former Balmwell House and Craigour care homes, moved in earlier in the year.
Inch View has many unique features, including infra red sensors in bedrooms to detect if residents get up unexpectedly during the night, rainwater harvested on the roof and then used to heat the home, and its own library and hairdressing room.
Residents were also consulted at length over the design of the new building which is sub-divided into smaller group living units of 15 bedrooms, each with their own sitting and dining areas. Bedrooms all have en-suite shower rooms and are of a good size - above the national standards for care homes.
Councillor Norman Work, Vice Convener for Health and Social Care at the City of Edinburgh Council, said this was the fourth new purpose built care home that the council has opened in the last four years.
He said: "These state of the art homes were designed in consultation with service users and the design sets the standard for other local authorities to follow.
"I have been very impressed with the facilities when at the home, which will give residents the opportunity to stay in accommodation which is more suitable to their needs, and gives them a better standard of living.
"Improvement of our care homes is part of our Live Well in Later Life 10 year plan for older people's services, which aims to provide a wide range of quality care and support, to meet older people's needs both in their own homes and in carefully designed homes."
Neil McFarlane is the regional director of GRAHAM Construction, the company which built Inch View.
He said: "This is the third care home GRAHAM has delivered in partnership with the City of Edinburgh Council and the Live Well in Later Life strategy. We are tremendously proud to be playing our part in this ongoing project delivering comfortable, modern, fit-for-purpose accommodation for residents around the capital.
"The high specification design and bespoke features at Inch View presented some interesting challenges for the project team, and overcoming these has bolstered our expertise and further equipped GRAHAM to deliver excellent facilities for the people of Edinburgh.
"We are looking forward to building on this relationship with the Council and work will soon be under way at Drumbrae, the next state-of-the-art care home in the portfolio."
The new care home is part of Edinburgh's strategy, and demonstrates the commitment to offering high quality residential care for older people in the city and giving them a home for life. The home is specially designed to be beneficial in providing a caring and supportive service for older people so they can enjoy a better quality of life.
Construction work is expected to start at Drumbrae later in the year.
(CD/GK)
Construction News
14/09/2011
New Care Home Puts Residents First

16/04/2025
Construction work on the £5 million repair and refurbishment project at the Loch Centre in Tranent is scheduled to commence in June 2026.
East Lothian Council has announced the anticipated start date for the significant upgrade to the well-used community facility.
Under the current timetable, the

16/04/2025
A £636,000 project to install solar panels at the Gorbals water pumping station in South Ayrshire has been successfully completed.
The scheme aims to provide a renewable energy source for pumping water to thousands of customers in the region.
The project involved the installation of 793 solar pan

16/04/2025
A planning application has been lodged with Glasgow City Council by The JR Group, acting on behalf of Wheatley Group, for the construction of 29 much-needed affordable homes in the Baillieston area of the city.
The proposed development on Caledonia Road will offer a mix of one- and two-bedroom apa

16/04/2025
Residents in 20 blocks of flats across Coatbridge are already experiencing the positive impacts of a recently completed, ambitious energy efficiency refurbishment project.
The extensive construction work has delivered significant improvements to the properties, including the installation of cavity

16/04/2025
Ground investigation works are commencing this month at the proposed site for Orkney Islands Council’s Scapa Deep Water Quay at Deepdale in Holm.
These initial investigations will be followed by marine-based site investigation works scheduled to begin in June.
These works form part of the Pre-Con

16/04/2025
Construction work has been finalised on a significant new housing development in Motherwell town centre, delivering 42 newly built, highly energy-efficient flats alongside the respectful conversion of the B-Listed YMCA building into a further six homes. The project, part of North Lanarkshire Council

16/04/2025
The Construction Industry Training Board (CITB) has today released its year-end performance data for its New Entrant Support Team (NEST), revealing a significant increase in apprenticeship starts. During the financial year 2024-25, NEST supported 4,128 individuals in commencing apprenticeships, a su

16/04/2025
A water-powered mill in Angus is set to grind grain once again after receiving a record-breaking donation to fund its restoration.
The National Trust for Scotland has announced that a long-time member of the conservation charity has gifted an incredible £2.4 million, one of the largest single dona

15/04/2025
Construction of a £70 million student accommodation development at 292-298 St Vincent Street in Glasgow has reached a significant milestone, with the building now visibly rising from the ground.
Drone footage has captured the progress of the project, which is a partnership between developer Artisa

15/04/2025
Energy regulator Ofgem is expected to confirm today (April 15) its finalised Connections Reform process, designed to expedite grid connections for renewable energy projects that are ready and crucial for achieving the UK's clean power targets for 2030 and beyond.
The new connections system, anticip