The Raploch URC has commenced work on Scotland's first ever mass timber, mixed use, low carbon development, which will create a mix of eco-friendly apartments and commercial units.
Funded by the Town Centre Regeneration Fund the building will be constructed by Cruden Homes East and located in Raploch’s Huntly Cresent, in the shadows of Stirling Castle. It will comprise three commercial units (two at 76sqm and one at 96sqm) on the ground floor and three two-bedroom apartments on the first floor and is expected to be completed by spring 2012. It is anticipated that the build will support six jobs in the local area.
Construction of the development began this month (August 2011). To meet its low carbon targets, the building is to be constructed from cross laminated timber, which is imported from Austria as the product is unavailable in Scotland. The external walls will be constructed to specifications which are recognised for their advantages in terms of sound absorption and transmission, air-tightness and thermal conductivity. The building will be finished externally with zinc roofing and cladding with rain screen cladding at street level.
It is also the Raploch URC's intention to install minimum micro-renewable equipment, with the inclusion of solar thermal panels for heating water and air source heat pumps for heating in the domestic units. In addition, an electronic building monitoring will be installed in order to measure the amount of energy used by the building in kwhrs. This information will be downloaded to enable the URC to analyse the data and the efficacy of the building as a low-carbon structure.
Kevin Braidwood, Head of Physical Built Environment at the Raploch URC, said: "This is the first time a mass timber, mixed use, low carbon development has been attempted in Scotland and we at Raploch URC are very proud to be leading the way in this area of construction.
"As we have progressed to date we have met a number of challenges, for example addressing the issue of occupancy use and also satisfying building regulations regarding structural stability. However we worked closely with Building Standards to carry out a review prior to the Building Warrant being granted and have been successful in doing so.
"We have also worked closely with construction experts at Napier University to fully investigate the properties of the structure under various conditions. They have been very supportive throughout the project design process and we will continue to work closely with them as the project progresses."
(CD)
Construction News
25/08/2011
Raploch URC Leads The Way With Low Carbon Development

15/04/2025
Construction of a £70 million student accommodation development at 292-298 St Vincent Street in Glasgow has reached a significant milestone, with the building now visibly rising from the ground.
Drone footage has captured the progress of the project, which is a partnership between developer Artisa

15/04/2025
Energy regulator Ofgem is expected to confirm today (April 15) its finalised Connections Reform process, designed to expedite grid connections for renewable energy projects that are ready and crucial for achieving the UK's clean power targets for 2030 and beyond.
The new connections system, anticip

15/04/2025
The ambitious transformation of Glasgow’s landmark George Square has moved into a tangible phase with the commencement of the erection of hoardings around the perimeter of the civic space. Starting today, the hoardings will enclose the Square for the duration of its 18-month redevelopment.
The pane

15/04/2025
Members of the public are invited to attend a consultation feedback event to discuss the proposed infrastructure associated with a new underground electricity transmission cable between the Kinardochy and Errochty substations in Perthshire.
The event will take place on Monday, 28 April, from 4 pm t

15/04/2025
Turner & Townsend have been appointed as project managers to develop a business case for the potential extension of the Borders Railway beyond its current terminus at Tweedbank to Hawick and Carlisle.
This key appointment will enable crucial work to progress on the project, including feasibility s

15/04/2025
Arran Community Renewables, a Community Benefit Society based on the Isle of Arran, has secured planning consent for a 6 MW solar farm. The Glenkiln Solar Farm, located approximately 1km west of Lamlash, is projected to generate 5,600MWh of clean renewable energy annually from 2027.
The £5 million

15/04/2025
A new Route Map has been published by the Scottish Land Commission (SLC) to ensure communities across Scotland secure tangible and long-lasting benefits from nature restoration projects and investment in the country's natural environment.
The practical guide is designed for landowners, developers,

15/04/2025
Award-winning principal contractor Procast Group has further expanded its presence across Scotland with the opening of a new base in Dumfries. The Hamilton-based firm has invested £30,000 in a new warehouse and office facility in the Maxwelltown Industrial Estate in Dumfries and Galloway, marking it

14/04/2025
Glasgow City Council's Affordable Housing Supply Programme (AHSP) facilitated the completion of over 1,000 new affordable homes in the city during the past year, despite facing budgetary reductions at the start of the financial year.
The initial grant of £78.687 million from the Scottish Government

14/04/2025
A key phase of Scottish Water's £11.5 million project to upgrade a strategic rising sewer main connecting Renfrew and Glasgow is set to begin, resulting in a significant road closure.
From Monday, 28 April 2025, Ferry Road in Renfrew will be closed to all vehicular traffic for a period of four mont