A £10 million contract to strengthen the M8 White Cart Viaduct has been announced by Transport Minister Stewart Stevenson.
The 12 month contract, which will be undertaken by BAM Nuttall on behalf of Transport Scotland, includes strengthening, maintenance and refurbishment works on the current bridge. The work is set to start this summer and will extend the life and reliability of the viaduct for years to come.
Transport Minister Stewart Stevenson said: “I am pleased to announce the award of this £10.6 million investment to bring the M8 White Cart Viaduct in line with today’s traffic demands.
“The M8 is a vital link in our strategic road network, and this bridge is now over 30 years old and requires strengthening to bring it in line with modern standards. This section is used by over 80,000 vehicles daily, and once completed these improvements will benefit motorists with a superior, safer route.
“The Scottish Government is committed to improving transport links across Scotland and it is pleasing to note that the works will be starting shortly on this key west Scotland route.”
The works, which will strengthen girders, replace the eastbound carriageway expansion joints, install new lighting and improve drainage, will mainly take place inside and underneath the bridge.
When finished, the 40mph speed limit, which was established with the narrow lanes in 2007 to reduce the effects of extra weight on the bridge, will also be lifted and the original lane markings reinstated over the viaduct.
These works to strengthen the viaduct complete a detailed programme of assessment and investigation of the supporting steel superstructure. The design will extend the life of the viaduct to support traffic for the foreseeable future and enable the work to be carried out whilst the viaduct remains in service for traffic.
(GK)
Construction News
10/06/2010
Contract Awarded For M8 Bridge Scheme

17/04/2025
A joint venture between Sir Robert McAlpine Capital Ventures and Buccleuch Property has successfully acquired 101 Centre Street in Glasgow, signalling a significant investment in the city's burgeoning southbank area. The 50/50 partnership aims to unlock substantial redevelopment potential on the 1.7

17/04/2025
Biotech firm MiAlgae has taken a significant step in its expansion plans by submitting proposals for a new production facility in Grangemouth, Scotland. The move is set to bolster Scotland’s green economic transition, with the first phase of the site projected to generate over 100 green jobs once op

17/04/2025
Scottish Water has completed the initial phase of a significant peatland restoration project at Loch Katrine, a vital source of drinking water for over a million customers in Glasgow and the surrounding areas.
The 400-hectare initiative aims to enhance water quality by reducing the amount of organ

17/04/2025
Clark Contracts has commenced work on a new £30 million purpose-built student accommodation (PBSA) development on Osborne Street in Glasgow.
The contractor was appointed by Ambassador Group to undertake the design and build of the 273-bed project.
Located in the heart of Glasgow City Centre withi

17/04/2025
Seven projects dedicated to promoting, celebrating, and enhancing Scotland's rich and diverse heritage are set to receive a share of £3.9 million in funding. The grants have been awarded through Historic Environment Scotland's (HES) Partnership Fund, which supports third-sector organisations making

17/04/2025
The Viking Community Fund has distributed over £1 million to 52 projects in the Shetland Islands since its inception on 1 September 2024.
The funding has provided vital support to a diverse range of community initiatives, from small grants for youth clubs and sports teams to significant investment

17/04/2025
The Finishes & Interiors Sector (FIS) has announced a new partnership with The Skills Centre to provide essential training and support for individuals seeking careers in the finishes and interiors sector. The collaboration is a direct response to the increasing skills shortage within the constructio

17/04/2025
John Aitchison, Managing Director of Maxi Construction, has announced the successful acquisition of several new contracts. Commenting on the recent awards, Mr Aitchison stated: "These contracts represent repeat business and awards via some of the frameworks we’re appointed to. We look forward to suc

16/04/2025
Construction work on the £5 million repair and refurbishment project at the Loch Centre in Tranent is scheduled to commence in June 2026.
East Lothian Council has announced the anticipated start date for the significant upgrade to the well-used community facility.
Under the current timetable, the

16/04/2025
A £636,000 project to install solar panels at the Gorbals water pumping station in South Ayrshire has been successfully completed.
The scheme aims to provide a renewable energy source for pumping water to thousands of customers in the region.
The project involved the installation of 793 solar pan