Subscribe to our Construction Newsfeed
Scotland Construction Directory
Search our 14,699 companies....

Construction News

21/04/2010

Call For Review Of Transmission Regime

Ministers have welcomed cross sector support to end the system which results in Scottish electricity generators paying the highest grid charges in the UK.

ScottishPower, Scottish and Southern Energy, Scottish Renewables, CBI Scotland, Scottish Chambers of Commerce, Scottish Trades Union Congress and IoD Scotland have today called for a review of the transmission charging system.

Parliament will tomorrow debate the issue and speaking ahead of the debate, Energy Minister Jim Mather said: "Scotland has some of the greatest low carbon energy resources in Europe, yet the locational approach to charging electricity generators results in Scotland facing the highest charges in the UK. That makes no sense.
-- Advertisement --
NorthernAsbestosServicesLtd



"There is a clear and growing consensus in Scotland, as evidenced by the Energy, Enterprise and Tourism Committee report last year and by a wide range of industry and civic interests since, that the locational charging approach is a significant barrier to fulfilling our potential and delivering a more sustainable, low carbon energy mix.

"We have been leading work to change the transmission regime and have already made an alternative case. I welcome the cross sector support today from industry, utilities, business organisations and trades unions to change the system. That support is crucial as we call on Parliament to support us in securing change and maximising Scotland's resources for Scotland's benefit."

(GK)

Latest Construction News

15/04/2025
Construction of a £70 million student accommodation development at 292-298 St Vincent Street in Glasgow has reached a significant milestone, with the building now visibly rising from the ground. Drone footage has captured the progress of the project, which is a partnership between developer Artisa
15/04/2025
Energy regulator Ofgem is expected to confirm today (April 15) its finalised Connections Reform process, designed to expedite grid connections for renewable energy projects that are ready and crucial for achieving the UK's clean power targets for 2030 and beyond. The new connections system, anticip
15/04/2025
The ambitious transformation of Glasgow’s landmark George Square has moved into a tangible phase with the commencement of the erection of hoardings around the perimeter of the civic space. Starting today, the hoardings will enclose the Square for the duration of its 18-month redevelopment. The pane
15/04/2025
Members of the public are invited to attend a consultation feedback event to discuss the proposed infrastructure associated with a new underground electricity transmission cable between the Kinardochy and Errochty substations in Perthshire. The event will take place on Monday, 28 April, from 4 pm t
15/04/2025
Turner & Townsend have been appointed as project managers to develop a business case for the potential extension of the Borders Railway beyond its current terminus at Tweedbank to Hawick and Carlisle. This key appointment will enable crucial work to progress on the project, including feasibility s
15/04/2025
Arran Community Renewables, a Community Benefit Society based on the Isle of Arran, has secured planning consent for a 6 MW solar farm. The Glenkiln Solar Farm, located approximately 1km west of Lamlash, is projected to generate 5,600MWh of clean renewable energy annually from 2027. The £5 million
15/04/2025
A new Route Map has been published by the Scottish Land Commission (SLC) to ensure communities across Scotland secure tangible and long-lasting benefits from nature restoration projects and investment in the country's natural environment. The practical guide is designed for landowners, developers,
15/04/2025
Award-winning principal contractor Procast Group has further expanded its presence across Scotland with the opening of a new base in Dumfries. The Hamilton-based firm has invested £30,000 in a new warehouse and office facility in the Maxwelltown Industrial Estate in Dumfries and Galloway, marking it
14/04/2025
Glasgow City Council's Affordable Housing Supply Programme (AHSP) facilitated the completion of over 1,000 new affordable homes in the city during the past year, despite facing budgetary reductions at the start of the financial year. The initial grant of £78.687 million from the Scottish Government
14/04/2025
A key phase of Scottish Water's £11.5 million project to upgrade a strategic rising sewer main connecting Renfrew and Glasgow is set to begin, resulting in a significant road closure. From Monday, 28 April 2025, Ferry Road in Renfrew will be closed to all vehicular traffic for a period of four mont
RBT Underfloor LimitedMorris & Spottiswood LtdEarth Tech LPS LTDEarth Tech LPS LTDAbout Grab Hire Uk LimitedNational Access & Scaffolding Confederation (NASC) - ScotlandAC Cable Solutions24-7 HealthcareThe Scottish Natural Insulation HubMaccaferri Ltd