Kingsland Primary School, at Neidpath Grazings in Peebles, has opened its doors.
One of three primary schools, designed by Archial Architects for Scottish Borders Council, the £8.5 million school accommodates more than 400 staff and pupils and contains 14 classrooms and a nursery.
Mark Fresson, of Designers Archial Architects, said: "The new school is located on a prominent site, acting as a gateway into Peebles near Neidpath Castle on the edge of the town.
"Making the most of its location, the building has been designed to have a strong connection to the outdoors, with views out over Peebles to the South and East.
"When it comes to schools, the architectural profession is often guilty of repeating mistakes made by the Victorians; some schools are still designed with windows which are placed so that younger pupils simply cannot see out. Kingsland, in contrast, benefits from full-height glazing so pupils can enjoy the connection with the outside world. In keeping with this ethos, the building where possible, is domestic in scale and height, creating an environment that is not intimidating to small children."
With a timeless, Scandinavian look and feel, Kingsland's classrooms are light and airy. Despite the fact that the structure is two storeys in places, 11 of its 15 classrooms have doors opening directly to the outside, emphasising the connection of the school to its semi-rural setting.
The front elevation of the school, which faces the road, is clad in dry stone walling, while the use of timber and white render lend a tactile, friendly quality to the building. As the site has a steep north to south fall running across it, the design strategy was to hide the bulk of the school’s two-storey games hall by cutting it into the hill.
(GK)
Construction News
08/03/2010
Scottish Borders Primary School Opens

15/04/2025
Construction of a £70 million student accommodation development at 292-298 St Vincent Street in Glasgow has reached a significant milestone, with the building now visibly rising from the ground.
Drone footage has captured the progress of the project, which is a partnership between developer Artisa

15/04/2025
Energy regulator Ofgem is expected to confirm today (April 15) its finalised Connections Reform process, designed to expedite grid connections for renewable energy projects that are ready and crucial for achieving the UK's clean power targets for 2030 and beyond.
The new connections system, anticip

15/04/2025
The ambitious transformation of Glasgow’s landmark George Square has moved into a tangible phase with the commencement of the erection of hoardings around the perimeter of the civic space. Starting today, the hoardings will enclose the Square for the duration of its 18-month redevelopment.
The pane

15/04/2025
Members of the public are invited to attend a consultation feedback event to discuss the proposed infrastructure associated with a new underground electricity transmission cable between the Kinardochy and Errochty substations in Perthshire.
The event will take place on Monday, 28 April, from 4 pm t

15/04/2025
Turner & Townsend have been appointed as project managers to develop a business case for the potential extension of the Borders Railway beyond its current terminus at Tweedbank to Hawick and Carlisle.
This key appointment will enable crucial work to progress on the project, including feasibility s

15/04/2025
Arran Community Renewables, a Community Benefit Society based on the Isle of Arran, has secured planning consent for a 6 MW solar farm. The Glenkiln Solar Farm, located approximately 1km west of Lamlash, is projected to generate 5,600MWh of clean renewable energy annually from 2027.
The £5 million

15/04/2025
A new Route Map has been published by the Scottish Land Commission (SLC) to ensure communities across Scotland secure tangible and long-lasting benefits from nature restoration projects and investment in the country's natural environment.
The practical guide is designed for landowners, developers,

15/04/2025
Award-winning principal contractor Procast Group has further expanded its presence across Scotland with the opening of a new base in Dumfries. The Hamilton-based firm has invested £30,000 in a new warehouse and office facility in the Maxwelltown Industrial Estate in Dumfries and Galloway, marking it

14/04/2025
Glasgow City Council's Affordable Housing Supply Programme (AHSP) facilitated the completion of over 1,000 new affordable homes in the city during the past year, despite facing budgetary reductions at the start of the financial year.
The initial grant of £78.687 million from the Scottish Government

14/04/2025
A key phase of Scottish Water's £11.5 million project to upgrade a strategic rising sewer main connecting Renfrew and Glasgow is set to begin, resulting in a significant road closure.
From Monday, 28 April 2025, Ferry Road in Renfrew will be closed to all vehicular traffic for a period of four mont